Laserfiche WebLink
Date: March 19,2001 SIECOR <br /> �IJJL� <br /> International Inco rporaled <br /> CHEVRON GROUNDWATER MONITORING REPORT (4Q2000) <br /> Primary Agency: Ron Rowe <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No.: 9-0557 Address: 139 South Center Street,Stockton, California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International, Inc. —Roger Hoffmore <br /> Consultant Project No.: 077.43461.002 <br /> Assembly Bill 681 Status: Property Owner: Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Fourth Quarter—2000: <br /> i1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted groundwater monitoring report. <br /> 3. Site assessment report in progress. <br /> WORK PROPOSED FOR NEXT QUARTER: First Quarter- 2001: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit groundwater monitoring report. <br /> 3. Finalize and submit Site Assessment Report. <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring and Sampling,and Site Assessment <br /> Frequency of Groundwater Sampling: Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP) Present On-Site: No <br /> Current Remediation Techniques: N/A <br /> Approximate Depth to Groundwater: 22 to 23 feet <br /> Groundwater Gradient: Southeast @ 0.003 ftfft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CR 95670 916.861.0400 916.861.0430 Fax www.secor.com <br />