My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 1:24:43 PM
Creation date
2/25/2019 10:29:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 4" _ <br />L <br />rn.."I — 7 42 ,......e.-.. ref paml <br />1 <br />its - Water in pg/ L (Ppb) <br />KT@TL-G4D7ZOR TOMIlLKm TPS � <br />4NIr�LK I.D. . - <br />6PA Method 5030/8020/602 <br />(}J r 6PA Ma Shod 5030 and Modified PPA Method 80f <br />ND COMPGnda Not Detected below Method DeGctt n LIMIts <br />• LL <br />MCL • -':ontaelnant Love'&. Drinking water 8t dard■ <br />5.0 EVAI-UnTION OF nEMEDIATIOM ALTERNATIVES <br />A no -action alternative has been de ermined to bis unacceptable for <br />this site based on the LUFT manual guidolines, and the RWQCB basin <br />plan. Therefore, only the pump and treat remediat_.cn optiun has been <br />considered. <br />6.0 PROPOSED GROUNDWATER nEMEDIAL ACTION PLAN <br />6.1 Design Criteria <br />The primary design factor in the pum and treat system is the pumping <br />rate required to establish hydraulic control of the contaminant <br />plume. The ability to recover contaminants from the shallow <br />groundwater zone is largely dependentupon the location and discharge. <br />rates of the recovery well(s) and he total plume size. Once the <br />sustainable system flow rate £o a recovery well system is <br />established, it can be considered together with the chemical data to <br />specify materials, size plumbing and determine treatment system <br />requirements. <br />RESNA/Waterwork Corp. conducted a series of constant -rate pumping <br />tests at the site to evaluate hydrologic and well conditions, and <br />provide baseline information for the design and operation of the <br />remedial system. The testing pr gram comprised three separate <br />elements designed to provide different types of information. The <br />first element consisted of a brie period of static groundwater <br />monitoring. This data was used to establish initial conditions and <br />to aid the evaluation of the signi icance of water level changes <br />observed during the later pumping tests. <br />The second element of the test program consisted of three short term <br />constant rate tests using well MW5. This series of tests provided <br />information regarding the well productivity and efficiency. The <br />Weber Point Property - 475 5 <br />H2OMP791.TLP <br />cu(Ei <br />19 1 <br />.C- <br />r <br />i <br />ik <br />Knlf>7i <br />TOrl Q <br />W1wORI� (1) <br />41091-:rill�`]:5. <br />'�`].7'� <br />-- 4.2:- <br />BW <br />640• <br />41091-MWI <br />�dl'�.. <br />•c 16 <br />21 <br />I�J9 <br />4I091-4091-PWr <br />X100 <br />+•-6.6 . <br />37 <br />• • 76 <br />41091-MW4 <br />ND <br />3.1 <br />-1.4.-. <br />1' .4 <br />+n600s <br />41091-MW5 <br />ND <br />ND <br />KD <br />ND <br />PID <br />PAIMARY Mn <br />1.0 <br />40 <br />30 <br />20 <br />Kk <br />6PA Method 5030/8020/602 <br />(}J r 6PA Ma Shod 5030 and Modified PPA Method 80f <br />ND COMPGnda Not Detected below Method DeGctt n LIMIts <br />• LL <br />MCL • -':ontaelnant Love'&. Drinking water 8t dard■ <br />5.0 EVAI-UnTION OF nEMEDIATIOM ALTERNATIVES <br />A no -action alternative has been de ermined to bis unacceptable for <br />this site based on the LUFT manual guidolines, and the RWQCB basin <br />plan. Therefore, only the pump and treat remediat_.cn optiun has been <br />considered. <br />6.0 PROPOSED GROUNDWATER nEMEDIAL ACTION PLAN <br />6.1 Design Criteria <br />The primary design factor in the pum and treat system is the pumping <br />rate required to establish hydraulic control of the contaminant <br />plume. The ability to recover contaminants from the shallow <br />groundwater zone is largely dependentupon the location and discharge. <br />rates of the recovery well(s) and he total plume size. Once the <br />sustainable system flow rate £o a recovery well system is <br />established, it can be considered together with the chemical data to <br />specify materials, size plumbing and determine treatment system <br />requirements. <br />RESNA/Waterwork Corp. conducted a series of constant -rate pumping <br />tests at the site to evaluate hydrologic and well conditions, and <br />provide baseline information for the design and operation of the <br />remedial system. The testing pr gram comprised three separate <br />elements designed to provide different types of information. The <br />first element consisted of a brie period of static groundwater <br />monitoring. This data was used to establish initial conditions and <br />to aid the evaluation of the signi icance of water level changes <br />observed during the later pumping tests. <br />The second element of the test program consisted of three short term <br />constant rate tests using well MW5. This series of tests provided <br />information regarding the well productivity and efficiency. The <br />Weber Point Property - 475 5 <br />H2OMP791.TLP <br />cu(Ei <br />19 1 <br />.C- <br />r <br />i <br />ik <br />
The URL can be used to link to this page
Your browser does not support the video tag.