Laserfiche WebLink
OPERATION PLAN CalRecycle 501 (Rev.6/14) <br /> Page 2 of 5 <br /> OUTSIDE STAGING AREAS <br /> CRM will install firefighting foam agent stations at the direction of SID to allow for the reduction to setbacks and minimum fire lane <br /> requirements.Additionally,CRM will add 3 additional hydrants as directed by SFD.Finally,CRM will place pre-connected hose lines <br /> to the fire hydrants in the tire staging area containing 200 feet of 1.5 inch hose and nozzles. <br /> INSIDE USE <br /> CRM will install connected fire hose racks with 1.5 inch hose lines for prevention measures as reconunended by SFD. <br /> III.STORAGE REQUIREMENTS CON'T <br /> A. FIRE PREVENTION MEASURES CON'T-§17351 <br /> Water Supply(indicate now in gallons per minute or containment capacities in gallons): <br /> Hydrant/Ca acit 2,100 al/min 20psi Water <br /> ® P Y g @— P ❑ Tank/Capacity. <br /> ❑ Welt/Capacity: ® Water supply within 500 ft.of storage piles <br /> ® Local fire authority alternative approval(attach) <br /> Waste tires located beneath electrical power lines>750 volts? No ❑ Yes(attach fire authority approval) <br /> B. FACILITY ACCESS AND SITE SECURITY-§17352 <br /> Attendant Present? ® Yes ❑ No [f Yes,daysihours present: <br /> M-1'8AM—SPM <br /> Access Control: ® Perimeter Fencing ® Locked Gates ❑ Other.describe: <br /> Is there access to the site for emergency vehicles? ® Yes ❑ No I f No,explain: <br /> C. VECTOR CONTROL MEASURES-§17353 <br /> ® Vector Control Plan for alternative measures approved/certified by(attach): <br /> ❑ Local Environmental Health Department <br /> ® Mosquito Abatement District <br /> ❑ Other, <br /> s ecifv: — <br /> ❑ Describe type of cover(s)or impermeable barrier(s)if utilized for vector control: <br /> Other vector control measures, Tires will not have vector control issues since tires will not sit in piles for more than 15 <br /> ® days.If any tires are in place for more than 15 days for any reason,they will be treated <br /> explain: as necessa <br />