My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1404
>
4700 - Waste Tire Program
>
PR0540862
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 10:18:27 AM
Creation date
2/25/2019 10:56:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540862
PE
4720
FACILITY_ID
FA0009519
FACILITY_NAME
CRM - Crum Rubber Manufacturers
STREET_NUMBER
1404
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337018
CURRENT_STATUS
02
SITE_LOCATION
1404 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRM Stockton Closure Cost Analysis <br /> Assumptions <br /> 1 CRM will utilize outside haulers to deliver material to the landfill <br /> 2 Each walking floor load will weigh approx.23.5 tons of shredded tires <br /> 3 Transportation Cost of$200 per load <br /> 4 Landfill Cost of$37.16 per shredded ton <br /> 5 200,000 tire cleanup=2,000 tons based on 20 pounds per PTE <br /> 6 2000 tons/23.5 shredded tons per load=85 loads <br /> 7 Escavator rental=$2,000/week <br /> Bobcat rental$1,000/wk for 3 weeks <br /> 8 Escavator Operator=$22.00/hr <br /> 9 Bobcat Operator=$15/hr <br /> 10 Shredder operator/security=$11.50/hr <br /> 11 Administrative Cost=5%of total cost <br /> 12 transport 6 loads per day @ 23.5 per load=15 operating days <br /> 13 Mobile shredder should process between 12-16 tons/hr and dependant on contractor contractor schedule(2-3 week complettion estimate) <br /> Calculations Based on <br /> Whole Tires <br /> Shredding Cost(based on 8 tons/hr) Per ton <br /> Bobcat operator(Labor cost) $ 1.88 <br /> Shredder Operator $ - <br /> Fuel $ <br /> Electricity $ <br /> TriC mobile shredder $ 30.00 (16 tons/hr 8 hr/day 6 days/week) <br /> Knives/R&M $ - <br /> $ 31.88 <br /> Loading Cost <br /> Escavator rental $ 4.00 ($8000/mo/2000 tons) <br /> Bobcat-$1000/wk $ 1.50 (3 weeks @$1000/2000 tons <br /> Loading Operator $ 0.70 ($22/23.5 tons/45 min) <br /> $ 6.20 <br /> Transport Cost <br /> Per load cost$200/23.5 tons $ 8.51 23.5 ton/load <br /> Landfill Cost <br /> Per Ton Fees $ 37.16 <br /> Security Cost <br /> 15 days of security at 16 hrs/day $ 2.76 30 days <br /> Closure Cost per Ton $ 86.51 <br /> Administrative Cost @ 5% $ 4.33 <br /> Total Closure cost $ 90.83 <br /> $ 181,666 <br /> Closure with contingency factor(1.2) $218,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.