Laserfiche WebLink
r <br />ARCO 1 BP WELL MONITORING DATA SHEET <br />BTS # 040929 -RMI <br />Station # 4493 <br />Sampler M McGowan K BJurstroin <br />Date -11-L 0 ti <br />Well I D <br />Well Diameter 2 3 4 6 8 <br />Total Well Depth <br />Depth to Water — <br />Depth to Free Product <br />Thickness ofFiee Product (feet) <br />Referenced to PVC Grade <br />ID O Meter (if req'd) YSl HACH <br />I D unct,r tutMI-1-V W1II U, inwltr Al i her <br />1" 004 4 065 <br />?" 0 16 6" 1-47 <br />Y 037 0thLr radius' * 0 163 <br />Purge Method ailer <br />Dispos.1ble Bailer <br />Positive irDisplaceinent <br />Electric ubmertiible <br />Extra ion Pump <br />Other <br />Top of Screen <br />Sampling Methodnailer <br />Dispsable Bailer <br />Ex ction Port <br />Other <br />If well is Iisted as a no -purge, confirm that water level is below the top <br />of screen Otherwise, the well trust be purged <br />_r <br />v = Gals <br />I Case Volume (Gals) <br />Specified Volumes Calculated Volume <br />Time <br />Tem( (t'F) <br />PH <br />Conductivity <br />(mS or pS) <br />Gals Removed <br />Observations <br />`p <br />(A-) f- <br />czk <br />C) � n <br />Id well dewater? es No allons actually evacuate <br />Sa ling Time Spin ling Date <br />Sampled D Laboratpiy Sequoia <br />r GR0 W X r h1\11 oris 121XA NMI [[VOCs Othei <br />D O (if teq'd \� re-puige <br />\L <br />Post -purge <br />Mr/L <br />,Analyzed <br />OR P (if req'd) Pre rge <br />InV <br />Post-puige <br />mV <br />!Blaine Tech Services, Inc. 15BU Rogers Ave., ban .hose, c:w y*'11 z f4uts f 5 f.5-u*05 <br />