Laserfiche WebLink
DEPARTMENT OF THE ARMY <br /> U S ARMY ENGINEER DISTRICT,SACRAMENTO 11 11 <br /> n CORPS OF ENGINEERS ll L! L�11 11 <br /> 1325 J STREET ' <br /> FEALY?O <br /> SACRAMENTO CALIFORNIA 95814 2822 _ 2 <br /> 17 <br /> ATTENTION OF August 27, 1997 <br /> Regulatory Branch (199700080) 5(CAMRE <br /> ENVIRONMENTAL CONSULTANTS,INC. <br /> John Little, PhD. <br /> Sycamore Environmental Consultants <br /> 6355 Riverside Blvd. , Ste. C <br /> Sacramento, California 95831 <br /> Dear Mr. Little: <br /> We are responding to your request to reconstruct an 835 <br /> lineal foot concrete seawall bordering the south side of Weber <br /> Point in Stockton, at Township 1 North, Range 16 East, in San <br /> Joaquin County, California. The Section 10 portion of the <br /> project is authorized under a letter of permission as shown on <br /> the enclosed drawings, and subject to the enclosed conditions. <br /> i <br /> i � <br /> Under Section 404 of the Clean Water Act, the Chief of <br /> Engineers has issued Nationwide Permit Number 13 for bank <br /> stabilization activities, and Nationwide Permit Number 25 for <br /> I structural discharges. Your project may be authorized under <br /> these nationwide permits provided you meet the terms and <br /> conditions of the enclosed information sheets, including State <br /> Water Quality Certification. In addition, upon project <br /> ' completion you must sign and return the enclosed compliance <br /> certification form acknowledging adherence to the conditions of <br /> the permit. <br /> ' General Condition 9 of the sheet states individual state <br /> water quality certification must be obtained or waived. <br /> Therefore, the proposed project is denied without prejudice and <br /> ' cannot be authorized until either water quality certification or <br /> a waiver is obtained. Water quality certification or waiver must <br /> be obtained from the Regional Water Quality Control Board, 3443 <br /> ' Routier Drive, Sacramento, California 95827. <br /> This verification will be valid for a period of two years <br /> from the date of this letter. Work may then proceed subject to <br /> the terms and conditions of certification. You should contact <br /> this office if work will extend beyond this date. This <br /> nationwide permit is scheduled to be modified, reissued, or <br /> ' revoked prior to February 11, 2002. It is incumbent upon you to <br /> remain informed of changes to the nationwide permits. <br /> II <br />