My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:30:34 PM
Creation date
2/25/2019 2:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 1 <br /> Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- <br /> June 23, 1992 Telecopy415/973-9201 <br /> Mr. Val F. Siebal <br /> California Environmental Protection Agency <br /> r Department of Toxic Substances Control <br /> 10151 Croydon Way <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Siebal : <br /> Re: Docket #HSA 90/91-08 - Stockton Manufactured Gas Plant Site <br /> Subject: Remedial Investigation Report Submittal <br /> PG&E respectfully requests a 30 day extension of the July 13 deadline <br /> for submission of the Draft Remedial Investigation (RI) Report to <br /> Department of Toxic Substances Control (DTSC) . <br /> The requested extension will be used to finalize the draft document. We <br /> have fallen behind the proposed schedule primarily due to the <br /> requirement that additional work (Phase 2) be conducted to complete the <br /> soil and groundwater characterization. The results of the Phase 2 <br /> investigation in Area II will be included as part of the RI Report. A <br /> workplan for the Phase 2 investigation in Area I has been submitted to <br /> DTSC, but the results will not be available for inclusion in the RI <br /> Report. The schedule for the Risk Assessment (and subsequent documents) <br /> will be similarly impacted by the Phase 2 work. PG&E will submit a <br /> revised schedule after the scope and timing of the Phase 2 activities <br /> are approved by DTSC. <br /> We appreciate your consideration of this request. If you have any <br /> questions, please call me at (415) 973-1116. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.