lb- <br /> Pacific Gas and Electric Company Environmental Services <br /> PO Box 7640 <br /> San Francisco,CA 94120 <br /> January 15, 1992 415/972-7000 <br /> Direct Dial 415/972- <br /> Telecopy415/972-9201t� <br /> Mr. Val F. Siebal �` <br /> California Environmental Protection Agency <br /> Department of Toxic Substances Control JAN 2 1 1992 <br /> 10151 Croydon Way FNVIRONMENTAL HEALTH <br /> Sacramento, CA 95827 PER MIT/SERVICES <br /> r Attention: Mr. Fernando Amador <br /> Dear Mr. Siebal : <br /> Re: Docket #HSA 90/91-08 - Stockton Manufactured Gas Plant Site <br /> Subject: Interim Remedial Measure Results <br /> Please find enclosed two copies of the document, Interim Remedial <br /> Measure Report of Findings and Recommendations - PG&E Stockton Former <br /> MGP Site. This document provides recommendations to mitigate human <br /> exposure to residues as required by Section 3.0 of the above referenced <br /> Order. <br /> After reviewing the various alternatives, PG&E supports the <br /> recommendation of our environmental contractor, CH2M Hill , that a <br /> concrete cover be placed over the entire embankment to address the <br /> elevated PNAs. In keeping with the goals of the IRM, PG&E recognizes <br /> that this action is temporary pending the adoption of a Remedial Action <br /> Plan for the site. However, we believe the proposed cover fully <br /> mitigates all potential human exposure pathways, and may serve as a <br /> permanent measure, depending on the final Remedial Action Plan. <br /> The Order specifically addresses soils in the southern portion of Area I <br /> (Hazelton Avenue strip) . However, based on the results of the IRM <br /> investigation, PG&E believes that it would be prudent to also evaluate <br /> adjacent surface soils east of the Hazelton Avenue strip. These soils, <br /> although not directly adjacent to the former MGP site, are similar in <br /> overall appearance. Our consultant has sampled these soils at locations <br /> shown to Mr. Fernando Amador on January 9. Based on the chemical <br /> analysis of these samples, PG&E will propose the areal extent of the <br /> concrete cover for this embankment. <br /> We thank you in advance for your support of these activities. Following <br /> your approval of the enclosed document, PG&E will initiate the interim <br /> remedial measures. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br /> Enclosure <br />