My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:30:34 PM
Creation date
2/25/2019 2:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electriccompany Environmental Services • <br /> P.O.Box 7640 <br /> San Francisco, CA 94120 <br /> 415/972-7000 <br /> December 16, 1991 Direct Dal 415/972- <br /> Telecopy 415/972-9201 <br /> Mr. Val F. Siebal <br /> California Environmental Protection Agency , al <br /> Department of Toxic Substances Control <br /> 10151 Croydon Way 3 1011;1 <br /> Sacramento, CA 95827 DEZ 2 ZN <br /> r Attention: Mr. Fernando Amador ENVt C)N,I SERV CE <br /> P <br /> Dear Mr. Siebal : <br /> Re: Docket #HSA 90/91-08 - Stockton Manufactured Gas Plant Site <br /> Subject: Interim Remedial Measure Work Plan <br /> Enclosed please find two copies of the "PG&E Stockton Former MGP Site <br /> Interim Remedial Measure Work Plan. " This document has been revised to <br /> address comments received in the November 25 letter from your office <br /> regarding the schedule for completion of the letter report and signature <br /> of a registered Professional Engineer or Geologist. In addition, the <br /> analytical method for soil samples has been changed from EPA 8100 to EPA <br /> 8310, as the latter has lower detection limits. <br /> Please contact me if you have further comments on this Work Plan. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C. E.G. <br /> Manufactured Gas Plant Project <br /> cc: Mr. William Crooks, Executive Officer <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, CA 95827 <br /> Mr. Ron Valinoti , Director <br /> San Joaquin Local Health District <br /> P.O. Box 2009 <br /> Stockton, CA 95202 <br /> Attention: Ms. Eleanor Ratliff <br /> Enclosure(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.