My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • PETE WILSON.Gov m <br /> • ,4TE OPCALIFORNIA—ENVIRONMENTAL PROTECTION AGENCY <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL <br /> 10151 CROYDON WAY,SUITE 3 <br /> SACRAMENTO,CA 95827-2106 <br /> (916) 255-3737 <br /> February 3, Eq D <br /> F E 0 0 5 11993 <br /> E►wVIRONKr TAL MrA. .TM <br /> Mr. Robert Doss, P.E. PERMIT/SERVICES <br /> Project Manager <br /> Pacific Gas & Electric Company <br /> Environmental Services <br /> 77 Beale Street, Room F-1636 <br /> San Francisco, California 94106 <br /> PACIFIC GAS & ELECTRIC (PG&E) , STOCKTON, REMEDIAL INVESTIGATION <br /> AND RISK ASSESSMENT REPORT <br /> Dear Mr. Doss: <br /> The Department of Toxic Substances Control (Department) has <br /> completed its review of the Remedial Investigation (RI) portion <br /> of the Remedial Investigation and Risk Assessment Report (RI/RA <br /> Report) submitted in November 1992 . Enclosed are the <br /> Department's comments concerning the RI portion. Comments #6 and <br /> #% also concern the general requirements for the Risk Assessment <br /> (RA) . Detailed RA comments will follow after the Department <br /> completes its review. Please address the following comments <br /> within three weeks from receipt of this letter: <br /> 1. Figure 4-8 contains a typographical error. The groundwater <br /> elevation value for Well MW-8 is listed as -34 . 27 . <br /> According to Table 4-2 , the correct value is -35. 27 . <br /> 2 . Paragraph two of Page 5-8 contains a typographical error. <br /> PNA concentrations were detected at borings B-25 and B-26 to <br /> 42 . 5 feet, not 4 . 25 feet. <br /> 3 . The discussion on Pages 5-13 and 5-14 on the use of TTLC and <br /> STLC is incorrect. The correct value to use is 10 times the <br /> STLC, not 20 times the STLC. <br /> 4 . The installation of groundwater monitoring Wells MW-11 and <br /> MW-12 have confirmed that PNA contaminants are migrating off <br /> site to the west and the southeast in the shallow zone. <br /> Installation of additional downgradient wells will be <br /> necessary to characterize the lateral extent of migration in <br /> the shallow zone. The objective of groundwater <br /> characterization includes defining the extent of <br /> contamination to background concentrations. The report must <br /> include a discussion describing the extent of <br /> characterization achieved and the additional work required. <br /> PG&E must evaluate the work necessary to complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.