Laserfiche WebLink
Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco, Milk <br /> 415/973-7000 CA 94120 c .t'+, <br /> Direct Dial 415/973- r°" s P1 <br /> Telecopy415/973-9201 JAH Q 6 on <br /> January 4, 1993 ENVIRONMENTAL HEALTH <br /> PERMIT/SC <br /> VICE <br /> Mr. Anthony Landis <br /> California Environmental Protection Agency <br /> Department of Toxic Substances Control <br /> ' 10151 Croydon Way <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Landis: <br /> Re: Docket #HSA 90/91-08 - Stockton Manufactured Gas Plant Site <br /> Subject: Submittal of Feasibility Study <br /> As we discussed by telephone last week, PG&E respectfully requests that <br /> the February 9 deadline for submission of the Draft Feasibility Study <br /> Report to Department of Toxic Substances Control (DTSC) be postponed. <br /> We request that a new submittal date be set to correspond to 45 days <br /> after comments on the Remedial Investigation and Risk Assessment (RI/RA) <br /> Report are adequately addressed. <br /> This extension is necessary because PG&E has not yet received written <br /> comments on the RI/RA Report. The conclusions of these two studies <br /> provide the framework for defining areas of the site where remedial <br /> action is necessary, and those conclusions are central to developing the <br /> Feasibility Study. PG&E will submit a revised schedule after the RI/RA <br /> comments have been received from DTSC. <br /> We appreciate your consideration of this request. If you have any <br /> questions, please call me at (415) 973-1116. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br />