My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric, Company Environmental Services <br /> P.O.Bax 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- <br /> April 12, 1994 Telecopy 415/973-9201 <br /> James L. Tjosvold, P.E. <br /> Acting Chief Site Mitigation Branch <br /> California Department of Toxic Substances Control <br /> r 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket#HSA 90/91/08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Quarterly Summary Report (First Quarter. 1995) <br /> Pacific Gas and Electric Company (PG&E) submits this first quarter(1995) summary <br /> report for the Stockton Former Manufactured Gas Plant Site (site) in accordance with <br /> Provision 3.7 of the above-referenced consent order. This report summarizes technical <br /> activities conducted by PG&E in compliance with the order from December 19, 1994 to <br /> March 31, 1995 and activities planned for the next quarter. <br /> I. Activities Performed During Previous Ouarter: <br /> The Phase IIIc field investigation work was conducted between October 3, 1994 and <br /> November 11, 1994. Six new groundwater monitoring wells (one A Zone well, two B <br /> Zone wells and three C Zone wells) were installed and one existing well (in the A Zone) <br /> was replaced during this field work. After installation of these wells, groundwater <br /> sampling was conducted on all wells during November, 1994. During the week of <br /> December 5, 1994, a 24-hour aquifer pumping test was conducted on one of the new B <br /> Zone wells. <br /> II. Activities Performed During Current Ouarter. <br /> On January 31, 1995, PG&E submitted the"Phase III Technical Memorandum, Stockton <br /> Former Manufactured Gas Plant Site, Pacific Gas and Electric Company" to the <br /> Department of Toxic Substance Control (DTSC) and the Central Valley Regional Water <br /> Quality Control Board (RWQCB). This Technical Memorandum describes the field <br /> activities and soil and groundwater monitoring results associated with the installation of <br /> six new groundwater monitoring wells and the replacement of one well. This work <br /> occurred during the Fall, 1994. It also describes the results of the pumping test conducted <br /> during the week of December 5, 1994. <br />
The URL can be used to link to this page
Your browser does not support the video tag.