Laserfiche WebLink
Linda Turkatte <br /> Page 2 <br /> September 21, 1994 SEr 2 21994 <br /> SWE31614.P3.CC <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> • MW-17 and MW-20: 115 feet below ground surface, with the screened <br /> interval from 95 to 110 feet below ground surface and the grout seal at <br /> 90 feet below ground surface. <br /> • MW-18 and possible MW-19: 60 feet below ground surface, with the <br /> screened interval between 44 and 59 feet below ground surface and the <br /> grout seal at 40 feet below ground surface. <br /> If you have any questions or require any additional information, please feel free to call <br /> me at (510) 251-2888 extension 2175. <br /> Sincerely, <br /> C142MMHHILL <br /> Thom Littre <br /> Phase III Field Investigation Coordinator <br /> cc: Ron Mueller/PG&E <br /> Leslie Dumas/CH2M HILL <br /> Attachments <br /> I. City of Stockton Sewer Line Map <br /> 2. Existing and Proposed Well Locations <br /> 3. Encroachment Permit <br /> 4. Final Workplan Phase III Groundwater Investigation PG&E Former <br /> Manufactured Gas Plant Site, 535 Center St., Stockton, California <br /> Enclosures <br /> Check for Well Construction Permits <br /> Well Construction Permit (on-site wells) <br /> Well Construction Permit (off-site wells) <br /> Well Destruction Permit (on-site wells) <br /> oasawsl <br />