My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEALTH <br /> - Engineers <br /> Planners? i' ".V :: Pii2 is 1 <br /> Economists <br /> Scientists <br /> April 29, 1994 <br /> SWE31614.P3.CC <br /> Linda Turkatte <br /> San Joaquin County Environmental Health Department <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Subject: Well Permits for 535 S. Center St., Stockton, CA <br /> Dear Linda: <br /> Enclosed is a well permit application, a copy of our workplan, and a figure depicting all <br /> existing and proposed well sites on or near the PG&E Former Manufactured Gas Plant Site <br /> located at 535 Center Street in Stockton, California. Also attached is a copy of the sewer <br /> plans for the area. <br /> Six to seven new wells (MW-14, MW-15, MW-16, MW-17, MW-18, possibly MW-19, <br /> and MW-20) are scheduled to be installed between June 6 and July 1, 1994. The proposed <br /> well locations are shown on the attached figure in parentheses. These well locations have <br /> been changed from those in the workplan due to difficulties gaining site access. Wells <br /> MW-15 and MW-17 are scheduled to be installed on PG&E property, but their final <br /> locations may be offsite if Hydropunch groundwater samples collected from the onsite <br /> locations contain MGP residues. Similarly, MW-19 will be installed if the Hydropunch <br /> groundwater samples collected from Zone A during installation of MW-14 contain MGP <br /> residues. Wells MW-14, MW-16, and possibly wells MW-15, MW-17, and MW-19 will <br /> be installed on the City of Stockton right-of-way on Commerce and Church Streets (see <br /> attached figure). <br /> The proposed monitoring wells will be installed to the following depths: <br /> • MW-14, MW-15 and MW-16: 225 feet below ground surface, with the <br /> screened interval from 210 to 220 feet below ground surface and the grout <br /> seal at 190 feet below ground surface. <br /> CH2M HILL 111 1 Broadway,P.O. Box 12681,Oakland,CA 94604-2681 510251-2426 Fax 510 893-8205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.