My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 7, 1998 <br /> 93 JAN -8 AM 11t 09 <br /> Cal/EPA <br /> Department of Mr, Bob Doss <br /> Toxic Substances project MPete Wilson <br /> anager <br /> Control Governor <br /> Pacific Gas & Electric Company <br /> 10151 Croydon Way Environmental Services Peter M. Rooney <br /> Suite P.O. Box 7640 Secretaryfor <br /> Sacramento, CA Environmental <br /> San Francisco, California 94120 <br /> 95827-2106 Protection <br /> PG&E-STOCKTON, DRAFT REMEDIAL ACTION PLAN <br /> Dear Mr. Doss: <br /> The Department of Toxic Substances Control (DTSC) and Regional Water <br /> Quality Control Board have completed review of the Draft Remedial Action Plan <br /> (DRAP) dated December 1997, prepared under terms of a Consent Order(Docket No. <br /> HSA 90/91-008) entered into by PG&E and DTSC in June 1991. The DRAP is approved <br /> for public review and comment which is scheduled between January 1998 and February <br /> 1998. Specific dates for the 30-day comment period and for the public meeting will be <br /> forwarded by Fact Sheet to the site mailing list. A copy of the final DRAP and <br /> supporting documentation must be placed in the established public repository for public <br /> review during the comment period. In addition,the enclosed CEQA documentation must <br /> also be placed in the public repository for review. <br /> By law, DTSC is required to prepare a preliminary nonbinding allocation of <br /> responsibility (MBAR) among all identifiable responsible parties for review. DTSC's <br /> NBAR is enclosed for your evaluation. <br /> If you have any questions or comments,please contact Mr. Fernando Amador at <br /> (916) 255-3737. <br /> Sincerely, <br /> J <br /> James L. Tjosvold,P.E., Chief <br /> Northern California-Central <br /> Cleanup Operations Branch <br /> Enclosures <br /> nbv�m'CTei on Rscydd Papn <br />
The URL can be used to link to this page
Your browser does not support the video tag.