My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` Pacific Gas and ElectricCompany Environmental Services • <br /> P.O.Box 7640 _ <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> Oe <br /> Tlecopy 415/973-9201, r E T• 1 Ali 11: 4 1 <br /> March 10, 1997 <br /> James L. Tjosvold, P.E. <br /> Chief, Site Mitigation Branch <br /> California Environmental Protection Agency <br /> = Department of Toxic Substances Control <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Subject: Docket#HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site: <br /> Submittal of Revised Project Schedule <br /> Enclosed for your approval is a revised project schedule which updates the schedule <br /> previously submitted to you on January 22, 1997. This schedule has been revised to <br /> incorporate comments received from Fran Anderson and Fernando Amador of your staff. <br /> Separate meetings covering discussion and agreement on the revised VLEACH model <br /> results and on the groundwater mixing cell model approach have been combined into one <br /> two day meeting and separate meetings covering discussion and agreement on soil areas <br /> and volumes for remedy, on screening of remedial alternatives and on evaluation of <br /> detailed remedial alternatives have been combined into one two day meeting. In addition, <br /> mailing of the draft Fact Sheet has been revised to be coincident with agency approval of <br /> the draft RAP. <br /> If you have any questions or comments, please call me at (415) 973-6254. <br /> Sincerely, <br /> Patricia E. Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.