My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric Company Environmental Services <br /> P.O Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> August 19, 1999 Direct 7 <br /> elecopy 415/9 <br /> 73- <br /> T 415/973-9201 <br /> James L.Tjosvold, P.E. <br /> Chief, Site Mitigation Branch <br /> r Califomia Environmental Protection Agency <br /> Department of Toxic Substances Control <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Re: Docket No. HSA 90/91-08, Stockton Former Manufactured Gas Plant Site <br /> Subject: Ouarterly Monitoring, PG&E Stockton Former MGP Site <br /> Third Ouarter 1999 Event-Waiver <br /> Dear Mr.Tjosvold: <br /> Pacific Gas and Electric Company's (PG&E's) Stockton former manufactured gas plant <br /> site (site) is currently undergoing soil remediation. As a result of this on-going <br /> remediation, 17 of the 27 groundwater monitoring wells which were to be sampled in <br /> the third quarter, 1999, are unavailable for sampling. This letter confirms an <br /> August 17, 1999, discussion with Fernando Amador of your staff in which PG&E <br /> requested, and was granted, permission to waive the third quarter monitoring, 1999, <br /> event for the site. PG&E will resume sampling during the fourth quarter, 1999, when <br /> soil remediation is expected to be complete. During the fourth quarter event,PG&E <br /> proposes to conduct the annual sampling, which is normally done in the third quarter. <br /> The normal quarterly monitoring schedule will resume after the fourth quarter, 1999, <br /> event. <br /> Please call me at 415.973.6254 if you have any questions or require additional <br /> information. <br /> Sincerely, <br /> Patricia E. Sullivan <br />
The URL can be used to link to this page
Your browser does not support the video tag.