My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 James L. Tjosvold, P.E. <br /> October 23, 1998 <br /> Page 2 <br /> The public comment period on the DRAP and the proposed Negative Declaration began on <br /> January 9, 1998 and ended on February 9, 1998. A public meeting on these documents and <br /> the proposed remedial strategy for this site was held in Stockton on January 20, 1998. <br /> Public comments were received on the DRAP. These comments were discussed in a <br /> February 13, 1998 conference call between PG&E and DTSC; DTSC prepared the <br /> Responsiveness Summary to these comments. This Responsiveness Summary will be <br /> incorporated into the final RAP. On March 18, 1998, DTSC submitted its comments on <br /> the DRAP to PG&E. <br /> The final RAP which incorporates DTSC's March 18, 1998 comments was submitted to <br /> DTSC on March 26, 1998. The final RAP was approved by DTSC in a letter dated April 2, <br /> 1998. A public notice was placed in the April 3, 1998 Stockton Record announcing the <br /> finalization of the RAP and the Negative Declaration for the project. On April 9, 1998, <br /> PG&E issued a complete final RAP (which includes DTSC's final Executive Summary, <br /> DTSC's Responsiveness Summary, and the approved Negative Declaration for this project <br /> and its supporting CEQA Special Initial Study). <br /> Quarterly groundwater monitoring was conducted in March, 1998. The results of this <br /> quarterly monitoring were submitted to DTSC and the RWQCB on April 30, 1998 in the <br /> Quarterly Monitoring Report, PG&E Stockton Former MGP Site, First Quarter, 1998. <br /> II. Activities Performed During Current and Last Quarter: <br /> The final RAP and Negative Declaration for the project were approved by DTSC in a letter <br /> dated April 2, 1998. A complete final RAP (which included the approved Negative <br /> Declaration) was issued by PG&E on April 9, 1998. <br /> With the final RAP approved and complete, the Remedial Design and Implementation Plan <br /> (RDIP) is being developed for the project(currently scheduled to be submitted to DTSC in <br /> October, 1998). In connection with development of the RDIP,PG&E submitted <br /> procedures for managing excavated soil and residue from the site to DTSC on September <br /> 21, 1998. In this soil and residue management plan, PG&E indicated that procedures for <br /> managing excavated soil and residue as presented in the RAP need to be modified based <br /> upon recent sampling results and recent regulatory changes. In addition, on August 12, <br /> 1998, PG&E submitted proposed modifications to the groundwater monitoring program to <br /> DTSC. In response, DTSC provided an example flow chart which establishes criteria for <br /> automatically modifying a site's groundwater monitoring program. PG&E will use this <br /> example to develop a similar flow chart for modifying the groundwater monitoring <br /> program at the Stockton site. This flow chart will be included in the RDIP. <br /> Second quarter groundwater monitoring was conducted in June, 1998 and the results of this <br /> quarterly monitoring were submitted to DTSC and the RWQCB on July 31, 1998 in the <br /> Quarterly Monitoring Report, PG&E Stockton Former MGP Site, Second Quarter, 1998. <br /> Third quarter groundwater monitoring was conducted in September, 1998 and the results of <br />
The URL can be used to link to this page
Your browser does not support the video tag.