My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> February 6, 1998 Direct Dial 415/973- <br /> Telecopy 415/973-9201 <br /> James L. Tjosvold, P.E. <br /> Chief <br /> Site Mitigation Branch <br /> California Department of Toxic Substances Control <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> re: Docket No. HSA 90/91/08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Quarterly Summary Report(Fourth Quarter, 1997) <br /> Dear Mr. Tjosvold: <br /> Pacific Gas and Electric Company (PG&E) submits this fourth quarter(1997) summary <br /> report for the Stockton Former Manufactured Gas Plant Site (site) in accordance with <br /> Provision 3.7 of the above-referenced order. This report summarizes technical activities <br /> conducted by PG&E in compliance with the order from October 1, 1997 to December 31, <br /> 1997 and activities planned for next quarter. <br /> I. Activities Performed Durine Previous Quarter: <br /> The appendices for the Feasibility Study (FS)were sent to the Department of Toxic <br /> Substances Control (DTSC) and the Central Valley Regional Water Quality Control Board <br /> (RWQCB) on June 13, 1997. The appendices include information on two supplemental <br /> site investigations (one done in 1995 and one done in 1996); on the soil and groundwater <br /> modeling done on the site; and on the treatability study to evaluate in-situ soil stabilization. <br /> On June 20, 1997,DTSC approved the draft FS, submitted by PG&E on April 3, 1997 <br /> (Chapters 1-5) and on May 27, 1997 (Chapters 1-5), contingent on several items being <br /> addressed in the final FS. These items were addressed in the final FS which was submitted <br /> to DTSC on July 10, 1997. <br /> The Draft Remedial Action Plan(DRAP) and the draft Public Information Fact Sheet(Fact <br /> Sheet)were submitted to DTSC and the RWQCB on September 22, 1997. The DRAP <br /> summarizes the FS for the site. The draft Fact Sheet summarizes the Remedial <br /> Investigation(RI), Risk Assessment(RA),FS and DRAP for the site. <br /> On August 25, 1997, a conference call was conducted with DTSC and the RWQCB <br /> regarding verification sampling during soil excavation. During the conference call,the <br />
The URL can be used to link to this page
Your browser does not support the video tag.