Laserfiche WebLink
• Page 1 of 1 <br /> John Yoakum [EH] <br /> From: Kalil Kajiwara [KKajiwara@taberconsultants.com] <br /> Sent: Friday, May 25, 2012 11:18 AM <br /> To: John Yoakum [EH] <br /> Cc: Glen Wade; Ron Loutzenhiser <br /> Subject: FW: PGE substation -inspection time <br /> Hi John, <br /> Some additional information. The first CPT will be done by 9:00am and the second one by 11:00am. Please do keep <br /> in contact with Glen regarding the inspection times. <br /> Thanks! <br /> Kalil Kajiwara <br /> P:(916)371-1690 <br /> From. Kalil Kajiwara <br /> Sent: Friday, May 25, 2012 10:35 AM <br /> To: 'John Yoakum [EH]' <br /> Cc: Ron Loutzenhiser; Glen Wade <br /> Subject: PGE substation - inspection time <br /> Hi John, <br /> Some updated information: <br /> • The schedule is still the same, next Wednesday(May 30th). The boring and possibly one CPT will be ready to <br /> grout around 12:00-12:30pm. Please coordinate with Glen if you would like to see the CPT holes backfilled. <br /> • PGE is requiring special safety gear for anyone on site: you will need all appropriate PP&E(hard hat, boots, <br /> safety glasses, vest;gloves, earplugs, etc)as well as fire resistant clothing or coveralls and safety vest. <br /> Please let me know if you have any questions. <br /> Thanks! <br /> Kaili Kajiwara, P.E. <br /> Project Engineer <br /> Taber Consultants <br /> 3911 West Capitol Ave. <br /> West Sacramento, CA 95691 <br /> P: (916)371-1690 <br /> F: (916)371-7265 <br /> www.taberconsultants.com <br /> 5/29/2012 <br />