My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:33:21 PM
Creation date
2/25/2019 2:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> PSL/ <br /> John Yoakum [EH] 5 ZU S, d6tl'A jT <br /> From: Kaili Kajiwara [KKajiwara@taberconsultants.com] <br /> Sent: Friday, May 25, 2012 11:18 AM <br /> To: John Yoakum [EH] <br /> Cc: Glen Wade; Ron Loutzenhiser <br /> Subject: FW: PGE substation-inspection time <br /> Hi John, <br /> Some additional information. The first CPT will be done by 9:00am and the second one by 11:00am. Please do keep <br /> in contact with Glen regarding the inspection times. <br /> Thanks! <br /> Kaili Kajiwara <br /> P:(916)371-1690 <br /> From: Kaili Kajiwara <br /> Sent: Friday, May 25, 2012 10:35 AM <br /> To: 'John Yoakum [EH]' <br /> Cc: Ron Loutzenhiser; Glen Wade <br /> Subject: PGE substation - inspection time <br /> Hi John, <br /> Some updated information: <br /> • The schedule is still the same, next Wednesday(May 30th). The boring and possibly one CPT will be ready to <br /> grout around 12:00-12:30pm. Please coordinate with Glen if you would like to seethe CPT holes backfilled. <br /> • PGE is requiring special safety gear for anyone on site: You will need all appropriate PP&E(hard hat boots, <br /> safety glasses, vest, gloves,earplugs, etc)as well as fire resistant clothing or coveralls and safety vest. <br /> Please let me know if you have any questions. <br /> Thanks! <br /> Kail! Kajiwara, P.E. <br /> Project Engineer <br /> Taber Consultants <br /> 3911 West Capitol Ave. <br /> West Sacramento, CA 95691 <br /> P:(916)371-1690 <br /> F: (916)371-7265 <br /> www.taberconsultants.com <br /> 5/25/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.