My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:33:21 PM
Creation date
2/25/2019 2:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> Revised Detail Cost Estimates for Tasks <br /> Former Manufactured Gas Plant Site <br /> Stockton, California <br /> Task 1 Task 2 Task 3 Task 4 Task 5 <br /> Annual <br /> Groundwater Biennial MNA Annual Cap <br /> Monitoring & Sampling & Inspection & Estimated Routine <br /> Reporting Evaluation Reporting Cap Maintenance 5-year Review <br /> #of -V0-f -V0-f -F-of-F- -VO-11- <br /> Item <br /> ofItem Unit Rate Units Cost Units Cost Units Cost Units Cost Units Cost <br /> Labor <br /> Principal hour $160 5 $800 $0 1 $160 $0 4 $640 <br /> Senior Project Manager hour $140 30 $4,200 6 $840 12 $1,680 $0 16 $2,240 <br /> Project Engineer/Scientist hour $90 50 $4,475 $0 $0 $0 16 $1,432 <br /> Engineer/Scientist hour $75 40 $3,000 2 $150 15 $1,125 $0 $0 <br /> CAD Operator hour $60 20 $1,200 1 $60 4 $240 $0 4 $240 <br /> Clerical hour $40 20 $800 1 $40 4 $160 $0 4 $160 <br /> Labor subtotal 165 $14,475 10 $1,090 36 $3,365 $0 44 $4,712 <br /> Other Costs <br /> copies, misc. each $120 6 $720 0.5 $60 1 $120 $0 2 $240 <br /> vehicle da $60 1 $60 $0 1 $60 $0 $0 <br /> Field sampling contractor each $3,000 1 $3,000 0.1 $300 $0 $0 $0 <br /> Laboratory analyses each $4,000 1.07 $4,280 0.5 $2,000 $0 $0 $0 <br /> Pavement crack sealing each $200 1 $200 • <br /> Pavement seal coating sq ft $0.1 $0 $0 $0 100,000 $10,000 $0 <br /> Pavement patching (5%total area sq ft $4 $0 $0 $0 5,000 $20,000 $0 <br /> Shipping, mail each $50 1 $50 1 $50 1 $50 $0 1 $50 <br /> Other Costs subtotal $8,110 $2,410 $2301 $30,200 $290 <br /> Total: $22,585 $3,500 $3,5951 1 $5,002 <br /> CADocuments and SetfingsVnjavier.ENVDOMAIN\Local Settings\Temporary Internet Files\OLK2\Revised 30-Year Cost Estimate 25Feb2005 <br /> ,tsea raa <br />
The URL can be used to link to this page
Your browser does not support the video tag.