Laserfiche WebLink
TABLE 2 <br /> Detail Cost Estimates for Tasks <br /> Former Manufactured Gas Plant Site <br /> Stockton, California <br /> Task 1 Task 2 Task 3 Task 4 Task 5 <br /> Annual <br /> Groundwater Biennial MNA Annual Cap <br /> Monitoring & Sampling & Inspection & Estimated Routine <br /> Reporting Evaluation Reporting Cap Maintenance 5-year Review • <br /> #of #of of# #of #of <br /> Item Unit Rate Units Cost Units Cost Units Cost Units Cost Units Cost <br /> Labor <br /> Principal hour $160 5 $800 $0 1 $160 $0 4 $640 <br /> Senior Project Manager hour $140 30 $4,200 6 $840 12 $1,680 $0 16 $2,240 <br /> Project Engineer/Scientist hour $90 50 $4,475 $0 $0 $0 16 $1,432 <br /> Engineer/Scientist hour $75 40 $3,000 2 $150 15 $1,125 $0 $0 <br /> CAD Operator hour $60 20 $1,200 1 $60 4 $240 <br /> $0 4 $240 <br /> Clerical hour $40 20 $800 1 $40 4 $160 $0 4 $160 <br /> Laborsubtotal 165 $14,475 10 $1,090 36 $3,365 $0 44 $4,712 <br /> Other Costs <br /> copies, misc. each $120 6 $720 0.5 $60 1 $120 <br /> $0 2 $240 <br /> vehicle da $60 1 $60 $0 1 $60 $0 $0 <br /> Field sampling contractor each $3,000 1 $3,000 0.1 $300 $0 $0 $0 <br /> Laboratory analyses each $4,000 1 $4,000 0.45 $1,800 $0 $0 $0 <br /> Pavement crack sealing each $200 1 $200 <br /> Pavement seal coating sq It $0.1 $0 $0 $0 100,000 $10,000 $0 <br /> Pavement patching (5% total area) sq ft $4 $0 $0 $0 5,000 $20,000 $0 <br /> Shipping, mail each $50 1 $50 1 $50 1 $50 <br /> Other Costs subtotal $7,830 $2,210 $230 $30,200 1 $290 <br /> Total: $22,3051 1 <br /> $3,300 $3,595 $5,002 <br /> J Jr r a f!J P:\PGBE\Stockton\Correspondence\30-Near Cost Estimate Jan2005 Mal <br />