Laserfiche WebLink
Mar 071011:10a ArPminimartp 2098352297 p.6 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDER DISPENSER COA TAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4y0-542 <br /> 490-34b1.CONTINUOUS ELECTRONIC MONITORING ❑:.FLOAT AND CHAIN ASSEMBLY C13.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS— E199,OTHER(Sp-city): <br /> --------------------------- <br /> PANEL MANUFACTURER:�Q <br /> L ,AK SENSOR MANUFACTURER: C 1(00 490-57 MODEL4(S): 2D$ 490-Sr <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL.ALARI4IS � a.YES ❑b.NO 490•-`9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN D9 a.YES ❑b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSI'Hrvt TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49o41 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 49042 <br /> 2.UDC CONSTRUCTION IS :SINGLE-WALLED ::12.DOUBLE-WALLED "a-63 <br /> 1F DOUBLE WALLED: 49U—64z <br /> —LDC INTERSTITIAL SPACE I5 MONITORED BY: 3, PRESSURE_E713,vAcuuM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF TFr UDC TRIGGERS AUDIBLE-AND VISUAL ALARMS 0 a.YES ❑b.NO 490-6$ <br /> VfI.PERIODIC SYSTEM TESTING <br /> 1. LLD TESTING: THIS FACILITY NAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION GELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UERED.(23 CCR,,,2644.1) <br /> - ---vi-SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36,MONTHS 49n on <br /> ----------- -- —— — ------------ ----- —----- —---—-- <br /> 3.SPILL BCCKF.TS ARE TESTED ANNUALLY. - - ---—— -- — - ---••--•--... <br /> 390-67 <br /> VIII. RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> -59 Alarm logs +90-6sa ❑Visued Inspection Records 4x-6sb ❑Tank integrity testing results 490-6ac <br /> ❑SIR testing results(and supporting documentation records), 490-68d ❑ Tank gauging results(and supporting documentation records). 490-69e <br /> ❑ATG Testing resu!ts(and supporting documentation recordS).49P68r ❑ Corrosion Protection 60-day logs 4906te <br /> (§§-Equipment maintenance and calibration records. 490.68h <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of she fol lowicg documents relevant to their job duties. 494-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490S9b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49o.69. <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49049-- <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69[ <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAI'G1NG SYSTEMS"490-69t, <br /> ❑ OTHER(Specify):mwh,M6% <br /> JWThis facility has a"Designated UST Operator-who has passed the California GST System Operator Exam administered by cite International Code Council(ICC)- <br /> The"Designated UST Operarnr"will train ta`ilitY empin)•ees in the proper operation and maimcnance of the UST systems annually,and within 30 days of hire,This <br /> training will include,but is not limited to,the following: <br /> i Operation of the UST systems Ina manner consistent with the facility's best management practices <br /> 3 The facility employee's role with regard ro the monitoring equipment as specified in this UST Monitoring Plan <br /> !I ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> y Names orcontact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMEN'I'SIADDITIONAL INFORMATION <br /> Provide additional comments here or indiic�ate�t,pw y pages with additional information on specific monitoring procedures arc attached to this plan.499-n <br /> 1AM1�.d!�AG <br /> Q,t' �"�tL � t�IJtcIG � n� ✓i�"I QJIrw ro C��Q t;?Y <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Otaner/Operator is responsible for ensuring that: I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covtrred by 3 <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible or performing the monitoring and 1e�quipment maintenance <br /> NAME CSL �C Ln Tf-,,r t-- 49u.r1 TITLE i <br /> �` 7 4 1 .� t.. 0 .e:-. J9'Y73 <br /> NAME = `� (� OA TITLE r <br /> The Designated Operator shall y 490.75 <br /> perform a month! visual ins ction of the facility, provide a report to the otener/operator, and inform the owner/operator of any <br /> conditions that need fo[low-up action. <br /> XiI.OWNER/OPERATOR SIGNATURE <br /> CERTIFICAITON:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> X APPLICA IT SIGNATI'RE <br /> 49c-7 DATE: i <br /> - Nom' '• i v� er;t) rat 3 Ari hart.�� 4 ic- f nm <br /> .PPLICANT NAME-(print): X90.73 <br /> APPLICAN r TITLE: 4907 <br /> UPCF UST-D(1212007)3/4 <br />