My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address; UST Monitoring Site Plan <br />Date map was drawn: 01// L 17 /aUj j <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this Page, with <br />Monitoring System Certification. On your site plan, show the general layout of tanks andpiping.p g ' your <br />locations of the following equipment, if installed: monitoring system control panels; sensors monorin Clearly identify <br />spaces, sumps, dispenser pans, spill containers, or other secondaryg �k annular <br />detectors; and in -tank liquid level probes (if used for leak detection). In the s t areas; <br />or electronic line leak <br />was prepared.pan Provided, note the date this Site Plan <br />Page I of <br />7/03 <br />�ro7..... <br />.. <br />.3.::..... <br />�•o <br />...... ..... <br />..... .� <br />d <br />•.... <br />sygy <br />. . . <br />. . .. <br />.. . I . • . . <br />. .y. <br />87m <br />. <br />.. <br />. .. :. <br />..................• <br />....•,�o�� <br />7 <br />? <br />.. <br />: :' � <br />�� <br />oe. <br />. . <br />. . . <br />. . . . . . . . . <br />. . . . . . . <br />. : : <br />sSi' $Y <br />fti►n"�V 85/ <br />Date map was drawn: 01// L 17 /aUj j <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this Page, with <br />Monitoring System Certification. On your site plan, show the general layout of tanks andpiping.p g ' your <br />locations of the following equipment, if installed: monitoring system control panels; sensors monorin Clearly identify <br />spaces, sumps, dispenser pans, spill containers, or other secondaryg �k annular <br />detectors; and in -tank liquid level probes (if used for leak detection). In the s t areas; <br />or electronic line leak <br />was prepared.pan Provided, note the date this Site Plan <br />Page I of <br />7/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.