My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:13:59 PM
Creation date
2/26/2019 12:07:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 15201, Bravo CONY Retrofit Plan 8/21/12 <br /> Plan for control of the CONV Retrofit Plate <br /> ENVIRONMENTAL HEALIVH <br /> r,-_DnPT- APNT <br /> The Conversion Frame Retrofit Plate Kit is required only in very specific situations where existing <br /> electrical conduits are locked in concrete just outside the UDC opening. In this case, in order for the <br /> UDSCCS to be installed and function properly, holes must be cut or drilled in the conversion frame to <br /> accommodate the existing conduit lines and possibly the E-Y adapters. Bravo ensures absolute <br /> environmental protection by providing a fiberglass plate kit that is permanently bonded onto the <br /> conversion frame panels to cover the holes/cuts and to also seal directly to the conduit lines using <br /> fiberglass epoxy. The installation of this Retrofit Plate kit maintains the design and function of the <br /> drainage panels by containing any leaks from within the hydraulic cabinet —especially any fluids that <br /> may run down or along conduit lines- and channeling them into the interior of the UDC below. <br /> Bravo process for policing the CONV Retrofit Plate installation for existing external conduits. <br /> A) Bravo is contacted directly by the installer, or Bravo contacts the installer to communicate <br /> directly. By email, or by phone followed by email. Bravo does not communicate procedure or <br /> installation directions verbally. Bravo will maintain a paper trail history of each installation it <br /> authorizes. <br /> B) A completed Conversion Frame Evaluation Form will be sent to Bravo to help with evaluation <br /> and for records. <br /> C) For evaluation, the installer or an agent must send to Bravo complete, clear & unobstructed <br /> images of the conduit areas in relation to the existing UDC's. Bravo asks for closeup images <br /> and also images with the entire dispenser within the cameras frame. <br /> D) The installer is verified to be Bravo-Certified before authorization & installation. <br /> E) The installer must use only Bravo-supplied CONV Retrofit Plate components and materials for <br /> the Bravo Conversion Frame tailored to the specific installation on a per address/application <br /> basis after site evaluation. <br /> F) The installer may only install the CONV-132000 Conversion Frame along with the CONV <br /> Retrofit Plate kit when authorized in writing by Bravo letterhead on a per installer, per address <br /> and per application basis. In some cases the directions may need to be modified slightly to <br /> better apply to the specific layout of the conduit area. <br /> G) The installer must follow only our written instructions for this specific installation procedure. <br /> H) Post-installation the installer must send to Bravo images of the completed installation for <br /> review and further action as required. To be determined by Bravo engineering staff. Images <br /> are to match the pre-installation images as closely as possible to provide a before & after set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.