Laserfiche WebLink
Page 4 — Number 7 — answer "Yes" or "No" <br /> Page 4 — Number 9 — Describe how the soil will be handled if found to be contaminated. It cannot <br /> be replaced into the excavation, as described <br /> Page 5 — In the blank column on the far left, beneath "Dispenser Piping and Stockpile Samples", <br /> indicate the number of 'Dispenser Samples', number of 'Piping Soil Samples', and number of <br /> 'Dispenser & Piping Stockpile Samples' <br /> Page 5 — In the column (titled Tank #) on the far left of "Table #2 Recommended Minimum <br /> Verification Analyses for Underground Storage Tank Investigations" indicate the total number of <br /> samples to be analyzed for the constituents listed Table 2. <br /> Page 6 — Resubmit a legible copy of this page <br /> Provide the Vaporless (VMI) certification of the service technician <br /> Provide Veeder Root certification of the service technician <br /> Product & Vapor Piping Plan (F-4) — Currently illustrates that the diesel product lines are going to the <br /> existing dispensers 1-2 and 5-6 instead of existing dispensers 3-4 and 7-8. This contradicts what is <br /> stated on page 3. Also F-4 states that " 4 UDCs to remain" but only two UDCs (1-2 and 5-6) are <br /> proposed to remain. Please revise and resubmit F-4 and include labeling of the dispensers/UDCs. <br /> Amended SR0077233 (including replacement of all four dispensers with Encore 700 series 3+0 dispenser, <br /> install new Bravo CONV-RETROFIT-PLATE-HIT on UDCs 1-2 and 5-6 and repair leaks in all UDCs.) <br /> Page 3 — List beneath #4 — Bravo CONV-RETROFIT-PLATE-KIT on UDCs 1-2 and 5-6 <br /> 13 <br />