Laserfiche WebLink
Page 3 -List all components to be installed to convert the current 87-product siphon UST to a diesel <br /> UST. <br /> Page 3 - Describe how the lines will be plugged to the master 87-product UST. (Are there plans to <br /> uncover the 87-product siphon/diesel UST? If so, then include removal of the pipeline and collection <br /> of soil samples beneath the removed piping.) <br /> Page 3 — List the Red Thread IIA piping to be installed <br /> Page 3 — List the part numbers of the Smith FRG 3" over 2" product lines <br /> Page 3 — Indicate that there are two Bravo B8000 UDCs <br /> Page 3- Indicate that there are two Gilbarco Encore 700 3+1 dispensers <br /> Page 3 — List the model numbers to be used for the product and electrical penetrations <br /> Page 3 — List the make and model number of the line leak detector to be installed <br /> Page 3 — List sensor make and model numbers if new sensors will be installed <br /> Page 4 — Number 7 — answer "Yes" or "No" <br /> Page 4 — Number 9 — Describe how the soil will be handled if found to be contaminated. It cannot be <br /> replaced into the excavation, as described <br /> Page 5 — In the blank column on the far left, beneath "Dispenser Piping and Stockpile Samples", <br /> 10 <br />