Laserfiche WebLink
15. Page 5 — In the column (titled Tank #) on the far left of "Table #2 Recommended Minimum Verification Analyses <br />for Underground Storage Tank Investigations" indicate the total number of samples to be analyzed for the <br />constituents listed Table 2. <br />16. Page 6 — Resubmit a legible copy of this page <br />17. Provide the Vaporless (VMI) certification of the service technician <br />18. Provide Veeder Root certification of the service technician <br />19. Product & Vapor Piping Plan (F-4) — Currently illustrates that the diesel product lines are going to the existing <br />dispensers 1-2 and 5-6 instead of existing dispensers 3-4 and 7-8. This contradicts what is stated on page 3. Also <br />F-4 states that " 4 UDCs to remain" but only two UDCs (1-2 and 5-6) are proposed to remain. Please revise and <br />resubmit F-4 and include labeling of the dispensers/UDCs. <br />Amended SR0077233 (including replacement of all four dispensers with Encore 700 series 3+0 dispenser, install new <br />Bravo CONY -RETROFIT -PLATE -KIT on UDCs 1-2 and 5-6 and repair leaks in all UDCs) <br />Page 3 — List beneath #4 — Bravo CONV-RETROFIT-PLATE-KIT on UDCs 1-2 and 5-6 <br />2. Provide the UL listings for Blue Monster %" PTFE Thread Seal Tape, Blue Monster W PTFE Thread Seal Tape, <br />Blue Monster Heavy -Duty Industrial Grade Thread Sealant with PTFE and Rectorseal Tru-Blu Pipe Thread Sealant. <br />Please do not hesitate to contact me if you have any questions concerning the items listed above. <br />Thank you. <br />Vicki McCartney, Senior REHS <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205 <br />Phone: (209) 468-9852 <br />Email: vmccartney -sjcehd.com <br />SRI', <br />