My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N E.,.ironmental Health Department <br /> COUNTY <br /> Please be aware that the facility cannot operate the UST system and receive fuel in the <br /> diesel tank prior to the EHD inspection and approval. <br /> 4. In addition, the sampling analytical results must be submitted within 30 days after the UDCs <br /> and piping sampling. Only results that come directly to the EHD from a third party California <br /> certified laboratory with affixed chain of custody will be accepted by EHD. <br /> 5. Within 30 days from each shipment of hazardous waste, all pertinent hazardous waste disposal <br /> documentation (rinsate and all residual product disposal) must be submitted to the EHD. <br /> 6. Secondary containment testing for STP sumps tank#1 and tank#2 sumps (where piping has <br /> been terminated), for the newly installed UDCs 3/4 and 7/8, and the installed diesel piping is <br /> required six months after installation. Secondary containment testing for tank#1 fill sump <br /> maybe required six months after installation if it's determined that such testing is needed during <br /> its installation. Provide 48 hours notification to the EHD when this test is scheduled. <br /> 7. Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> a. Possess or be employed by a person who possesses one of several permissible valid, <br /> current contractor's licenses issued by the Contractors State License Board (may be issued <br /> to the installation company), or a Tank Tester's license issued to the individual by the State <br /> Water Board, and <br /> b. Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid, current California UST Service Technician <br /> certificate issued by the International Code Council (ICC), and <br /> c. Possesses a valid, current certificate of training from the manufacturer(s) of the <br /> component(s) being tested, repaired, or serviced. <br /> 8. Individuals installing underground storage tank system components must possess or work <br /> under the direct and personal supervision of an individual physically present at the work site <br /> who possesses all of the following: <br /> a. A valid, current contractor's license issued by the Contractors State License Board, and <br /> b. A valid, current UST Installation/Retrofitting certificate issued by the International Code <br /> Council (ICC), and <br /> c. A valid, current certificate of training from the manufacturer(s) of the component(s) being <br /> installed. <br /> 9. Log into the California Environmental Reporting System (CERS), update and submit the "UST <br /> Monitoring Plan" for diesel tank for approval. <br /> 10. Log into the California Environmental Reporting System (CERS), complete and submit a "UST <br /> Certification of Installation/Modification" form for the underground storage tank and piping <br /> within 30 days. <br /> 11. All components must be certified by an independent testing organization and labeled as <br /> required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br /> Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br /> 12. Permit expires 180 days from the date of approval. If an extension to the expiration date is <br /> required, a written request must be submitted to this office prior to the expiration date. <br /> 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.