My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPGRADE(E)VEEDER-ROOT TLS-350— revisions by <br /> FUEL SYSTEM MONITORING PANEL REMOVE VAPOR CAP&ADAPTER N 4/10/18 RE <br /> INSTALL 150#THEADED PIPE CAP (E)CONCRETE TANK SLAB <br /> ISOLATE DIESEL TANK VENT AT STACK (4)DW LISTS 10,000 GAL. 4/17/18 RE <br /> EXISTING C-STORE see F-6 Vent Stack TO REMAIN IN SERVICE (1) <br /> 6/28/18 RE <br /> CASHIER DIESEL UNE 7/2,18 RE <br /> PENETRATION <br /> � SEE NOV page 18 <br /> (E)EMERGENCY PUMP SHUT <br /> OFF SWITCH 1�_8 ------ ------- i 1 O <br /> 0 87 GASOLINE TANK TO BE CAP SIPHON LINE LU W <br /> - PUT TO DIESEL SERVICE ❑ cl� <br /> 1 -- <br /> CAP VAPOR LINE co <br /> PREPARE PER REGULATIONS see Scope of Work. Q Q <br /> � see notes sheet F-5 d <br /> --———————————————— ——— <br /> r 4 20'MIN.PER ELECTRICAL CODE (N)2"DIESEL 3"SC FRP �______(E)VAPOR UNEP--- - I I Ur p r-- <br /> - <br /> N TO REMAIN -J <br /> ( (E)SIPHON LINE <u <br /> (N)MPD 3+0 TYP.OF(2) -T--- ---- D two' <br /> o (E)2 UDC'S TO REMAIN I FILL SUMP,TYP.OF(4 w Z a U <br /> 14'-9" 12'-2" 14'-9" I ( CAP 2"SIPHON LINE (-) �> <br /> C, 3'-6" 87 2 -- AT SUMP ON TANKS CL ti CJ <br /> (N)MPD 3+1 DIESEL r ,o i #1 SEE F-5 ¢N F <br /> UDC, TYP.OF 3/4 ❑, 1/2 ❑, I - --- - -------T--- ---- LII i <br /> , <br /> 4 <br /> V <br /> LLJ <br /> SUMP PENETRATIONS (E)2"87 GASOLINE 3"SC FR I c°r <br /> _ t;, <br /> N <br /> 3'-6" FOR ALL PIPING 3/4 7/8 $7 3 -- W s <br /> SEE NOV page 18 I a y <br /> 3 PVC EXTRACTION <br /> (E)2"91 GASOLINE 3"SC FRP I <br /> _ - <br /> I ; o i _______________ -------- <br /> SYSTEMLINESABOVE o <br /> N)2"DIESEL 3'SC FRP (E)3"VAPOR RETURN FRP i a r--------------- 2 <br /> TANK ANNULAR,TYP.OF(4) <br /> i <br /> (N)MPD 3+0 TYP.OF(2) ( B <br /> (E)2 UDC'S TO REMAIN (E)CANOPY COLUMN d �__ PIPING SUMP = <br /> TYPICAL OF(4) 9 4 TYP.OF(4) Q <br /> J Z o <br /> (N)MPD 3+1 DIESEL <br /> i L------ - FILL SUMP,TYP.OF 4-----, <br /> UDC, TYP.OF(2) .. 7/8 ❑ 5/6 ; ❑ , I z o e <br /> ❑io BOLLARDS,TYP.O�(8) 31'-0�31'-0" Ln E <br /> - ---------------------------------Pod------------ - <br /> w m <br /> N w <br /> proximate limit We will open 2'x 3'near UDC 7/8 to expose product piping r o <br /> SUMP PENETRATIONS pipe cross over.County to verify Rubber put on d N <br /> of demolition for FOR ALL PIPING 3/4 7/8 lower pipes&approve for back fill. = w IR <br /> MPD 3/4 7/8 SEE NOV page 18 I LL <br /> J NOV FiberGlassSystems 11/30/2017 <br /> GENERAL INSTALLATION INSTRUCTIONS <br /> IS MADE PART OF THIS SUBMITTAL 1/8"= 1'-0" <br /> (E)CANOPY LINE —R.S.EAGAN <br /> (E)ASPHALT CONCRETE PAVING � N .- 17474 <br /> 1" D ,,17474F4.9 <br /> R .T.C. I i IF., � -r <br /> 25775 PATTERSON PASS ROAD PRODUCT & VAPOR PIPING PLAN F-4 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.