My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />NOV FIBER GLASS SYSTEMS <br />PIPE INSTALLATION HANDBOOK <br />UL/ULC Listed <br />RED THREAD IIA Primary and <br />Secondary Containment Pipe and Fittings <br />This manual is offered to assist it the proper fabrication <br />and installation procedures when assembling NOV <br />Fiber Glass Systems piping systems. <br />Part One details installation procedures for 2", 3", and <br />4" (50, 75, and 100 mm) diameter primary product <br />piping. <br />Part Two explains installation procedures for 3", 4" <br />and 6" (75, 100 and 150 mm) diameter secondary <br />containment piping. <br />ENGINEERING AND PRODUCT DATA: <br />Success by Design software per- <br />forms flow and other- engineering <br />calculations. Included in the CD- <br />s ,itM <br />ROM is a complete catalog and <br />installation video. Contact your sales <br />representative to obtain a copy or visit uutr� c uetna <br />our web site at www.fgspipe.com. <br />P�pttrg Byst., <br />NOV Fiber Glass Systems' products must be installed <br />and used in accordance with sound, proven practice <br />and common sense. <br />The information supplied in the literature must be <br />considered as an expression of guidelines based on <br />field experience rather than a warranty for which NOV <br />Fiber Glass Systems assumes responsibility. A limited <br />warranty of the products are offered in the Terms and <br />Conditions of Sale. <br />National Oilwell Varco has produced this brochure for general <br />information only, and it is not intended for design purposes. <br />Although every effort has been made to maintain the accuracy <br />and reliability of its contents. National Oilwell Varco in no way <br />assumes responsibility for liability for any loss, damage or injury <br />resulting from the use of information and data herein nor is any <br />warranty expressed or implied. Always cross-reference the <br />bulletin date with the most current version listed at the web site <br />noted in this literature. <br />CAUTION <br />This pipe may carry hazardous material and/or <br />operate at a hazardous pressure level; therefore, <br />it is imperative the instructions in this manual <br />are followed to avoid serious personal injury <br />or property damage. In any event, improper <br />installation can cause injury or damage. Installers <br />should read and follow all cautions and warnings <br />on adhesive kits, heat packs, propane torches, <br />etc. to avoid personal injury. Also, observe general <br />safety practices with all saws, tools, etc. to avoid <br />personal injury. Wear protective clothing when <br />necessary. <br />Make sure work surfaces are clean and stable <br />and that work areas are properly ventilated. <br />INSTALLATION TRAINING SEMINARS <br />Installers are required to attend training every <br />three years by a factory -trained representative. In- <br />depth training seminars are offered covering both <br />primary product and secondary containment piping <br />installation procedures. The training seminar involves <br />hands-on participation, and each attendee receives <br />installation manuals used during the seminar. Each <br />installer attending also receives documentary proof of <br />attendance. <br />It is required that anyone directly involved in <br />underground piping installations attend the NOV Fiber <br />Glass Systems' installation training seminar. For <br />information on training seminars, contact your local <br />distributor or representative. <br />To assist installers with proper installation of <br />fiberglass piping systems, Red Thread IIA Installation <br />Checklist for Underground Petroleum Pipe (82161) <br />is available. This sheet is included in the Petroleum <br />Marketing Catalog and accompanies each bundle of <br />pipe. For a copy of this checklist, contact your local <br />distributor or representative. <br />Publications available: <br />52101 RE -d Thread IIA Product Brochure <br />B2102 General Specifications <br />B2103 Series Piping <br />B2104 Vacuum Monitoring System <br />52107 Single -Wall Sump Entry/Termination Fitting <br />B2108 Bonded Sump Entry/Termination Fitting <br />82109 Gasketed Sump Entry/Termination Fitting <br />82161 Red Thread IIA Installation Checklist <br />F6600 1 "-6" Tapering Tool Instructions <br />F6625 Model 2100 Power Tool Instructions <br />F6624 Model 2102 Power Tool Instructions <br />F6640 Operating Instructions for Electric <br />Heating Collar <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.