Laserfiche WebLink
:Monitor"ing System Certification <br /> REGFINEp <br /> D. Results of Testing/Servicing JUL 2 6 2018 <br /> Software Version Installed: 334.00 ENVIRONMENTAL <br /> Complete the following checklist: HEALTH DEPARTMENT <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ❑ Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> ❑ N/A operational? <br /> ❑ Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* ❑ No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product; ❑ Water. If yes,describe causes in Section E,below. <br /> ❑ Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Ig1 Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> I . Comments: Tested sesor out shut down - diesel. Tested STP sump shut down - diesel. Tested #3/4 and #7/8 UDC <br /> sensor shut down -diesel. Tested fill sump sensor audible alarm. <br /> Page 2 of 4 <br /> 1!N-036—2/4 www.0 n i docs.org Rev.01/17/08 <br />