Laserfiche WebLink
SWRCB, January 200'_' <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 12 of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer 0 Industry Standard ❑ Professional Engineer <br />[I Other (.Specifi) <br />Test Method Used: ❑ Pressure ❑ Vacuum Q Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: TS -STS Equipment Resolution: 0.00" <br />Spill Box # 87S F <br />Spill Box # 87S V Spill Box # 91 F <br />Spill Box # 91 V <br />Bucket Diameter: <br />12.00" <br />12.00" 12.00" <br />12.00" <br />Bucket Depth: <br />14.00" <br />12.00" 12.00" <br />12.00" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min <br />5min 5min <br />5min <br />Test Start Time: <br />11:00am <br />11:00am 11:00am <br />11:00am <br />Initial Reading (RI): <br />11.00" <br />10.00" 10.00" <br />10.00" <br />Test End Time: <br />12:00pm <br />12:00pm 12:00pm <br />12:00pm <br />Final Reading (RE:): <br />11.00" <br />10.00" 10.00" <br />10.00" <br />Test Duration: <br />1 hour <br />1 hour 1 hour <br />1 hour <br />Change in Reading (RF-Rj): <br />0.00" <br />0.00" 0.00" <br />0.00" <br />Pass/Fail Threshold or <br />Criteria: <br />0.0625" <br />0.0625" 0.0625" <br />0.0625" <br />Test Result: <br />I Pass ❑ Fail <br />Pass ❑ Fail Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include inforn:atioi7 on repairs made prior to testing, and recommernded follow-up fa- failed tests) <br />