Laserfiche WebLink
RECEIVED <br /> JUL 2 4 2013" <br /> Monitoring System Certification <br /> UST Monitoring Site Plan ENVIROJC;6ENTAL <br /> HEALTH DEPARWI NT <br /> Site Address: ARP MINI MART—258775 PATTERSON PASS RD.—TRACY CA <br /> . . *PIPING* . . . . . . . . . . . . . . . . . . . <br /> . . Drawing of piping . . . . . . . . . . . . . . . . . . . . . . . . <br /> exit of sump and I . . 77771 <br /> uDC's.No . . DIE <br /> underground <br /> drawing is X X <br /> accurate, <br /> cannot speculate O F P <br /> *V/R blue prints. <br /> _ L <br /> C- STORE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . 87 MAI <br /> O X <br /> . . . . . . . O F O <br /> . . . . . . . X <br /> Ix . . . . . X L <br /> . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . 87 SLAVE <br /> v L <br /> }� X - . . . . . . O O P <br /> X X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> A=ANNULAR Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . . . . . . . . . . . . . . I . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . 91 <br /> L=Turbine/Leak Detector . . . . . . . . . . . . . . . . . . . . . O L <br /> X=SUMP SENSOR . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor . . . . . . . . <br /> S=Smart Sensor A F P <br /> C=Floats&Chains X X <br /> E=E Stop I D <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing not to <br /> scale. <br /> Date map was drawn:7/2/2018. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors,and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />