Laserfiche WebLink
SWRCB,January 2002 Page _ of <br /> 10. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> L7 Other(Spec) <br /> Test Method Used: ❑Pressure a Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): ENVIRONMENTAL <br /> Test Duration: P-ic, !TC-1 '�^^Tr1/PEf, <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments — (include information on repairs made prior to testing, and recommended Ji)llow-up for failed tests) <br />