My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> tVAY 6 7 2018 <br /> ENVIRONMENTAL <br /> MENTAL <br /> HFaIT+-s OFRARTMENT <br /> 4a. Tank#1 Fill Jump_ Remo- e phase I 'vapor cap and adap.er. Install 150 <br /> threaded pipe cap or; riser_ <br /> 41o.. Tank#1 Piping Sump. Install "FRP' end cap on siphon cine to is+otate same. <br /> lnstaN `FRP' end cap on vapor line to isolate sante. Piping remains in place- <br /> 4c.. Tank #2 Piping Sump_ Install`FRP" end cap on siphon lime to Tank#t1. <br /> �. <br /> Install neva Na "FRP" rigid diesel product piping as shown on sheet F-4. <br /> asoline and-vapor piping to new UDC°s will be connected to the existing piping <br /> n fror:t of dispensers as close as pracfical. Thea are no crossovers. <br /> ,�. Te:,t piu:.n4 and &chedule inspeect_ions as requ red by permits <br /> ,oil sarCpling may 1�e- rC-Cs.,u'--d bar ,' JPA an or tl=e per7iits. and scheduling of <br /> same shall be Dbserved. result~ fndin-::�s in a repo-t c CUPA all as <br /> regU regi by pem)its. - <br /> c- Backfill piping, with approved aea gravel all as per indus" standards. <br /> 9. Replace pac and asphalt concre a disturbed by the work as pe;industry standards <br /> 10. Replace existing gasoline float with Veeder Root Mag diesel float in tank# 1. <br /> 11- Upgrade `,:eti ser-F,'oot _31EJu M&.1;for S,.,,stem as applicable. <br /> 12. The existing underground tank we€it pfping will re€n&n and diesel vent riser <br /> will be isolated at the vent riser. Install new psi Morrison vent cap- <br /> 13. Tne existing fill, phase i vapor. tank gage and tank annular ass e:n.Ny and <br /> riven are existing on tanks #2, ?. and 4. and .gill rema:r, in sier%ioe. <br /> 14. Protection of the exi:stirtg tanks and or pips,ng d-ot is to remain n service is of <br /> the utmost immrtance. The work area small be fence_- and remain until <br /> the facility is operauIortal and operfed for busir.e5s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.