Laserfiche WebLink
Scopt Gf Work -- ARP MINI MART, 25775 PATTEERSON PASS RD, TRACY <br /> 1. Install new diesel piping as shown in boild Une on sheet F-4. Gasoline and, <br /> vapor piping, will connect to existing lines at (2) new UDC's for diesel N4 and 718. <br /> There are no cross oveirs they simply tum in as shown. <br /> 2. Remove (2 k'E'i IVIPD�'s#31,4,718 reptaced with, new MPD's 3+1's for diesel. <br /> I Install (2) new single wall IDC*s#314 718 for the neIPD's 3+1 for diesel. <br /> 4a. Tank#11 Fill Sump. Remove phase Ivapor cap and adapter. Install 150# <br /> threaded pipe cap on riser_ <br /> 4h. Tank #1 Pong Sump. Install "FRP' end capon siphon tine to isolate same. <br /> Install LFRP*" end Gap on vapor line to isol to same. Piping remains in place_ <br /> 4c_ Tank #-22 Piping Sump- Install "FRP" end capon siphon line to Tank #1. <br /> 5. Install new NOV"FIRP' rigid diesel product piping as shown on sheet F-4. <br /> Gasoline and ,,.,apor piping to new UDC'swill be connected to the existing piping <br /> in front of dispensers as close as practical. There are no crossovers. <br /> 6. Test piping and schedule inspections as required by permits- <br /> - * d heduliof ng <br /> 1. Soil sampling may be required by CUP,.,',' and or the permits ansc <br /> same shall be observed. Submit results findings in a report to CUP A all as <br /> required by pemifts. <br /> 8- Backfill piping with approved pea gravel all as per industry standards. <br /> 9. Replace- pce and asphalt concrette disturbed by the work as perindustry v.andards- <br /> ii- Upgrade Veeder-Root 350 Monitor System as applicable. C (�2 py <br /> 12. The existing underqround tank vent piping Mll remain and diesel vent riser <br /> will be isolated at the vent riserz. Install, new pv Morison vent cap_ <br /> 13. The existing full, phase I vapor. tank gage and tank annular assembfy and <br /> risers are existing on tanks,#2, 3 and 4. and YoAll remain in service. <br /> 14. Protection of the existing tanks and or piping that is to remain in service, is of <br /> the utmost int poftance. The wGrk area shall be fenced and rem,ain until <br /> the facility is operatik>nal and opened- for business. <br />