Laserfiche WebLink
i <br /> Roger Huckins -2- February 4, 1999 <br /> Task Amount Pre-Approved Comments <br /> 4. Develop Wells 1000 Development of 6 new wells . Pre- <br /> approval reflects typical charges for well <br /> development. <br /> S . Sampling of Wells 1 ,040 16 hours at $65/hr are pre-approved. <br /> 6. Analysis of Water Samples 480 <br /> 7 . Disposal of Waste 2,000 Disposal of 20 barrels are -pre-approved. <br /> 8 . Report 11500 Invoice has to be itemized. <br /> 9. Misc. Supplies 1 ,500 Invoice has to be itemized. If rented <br /> equipment is used, submit subcontractor <br /> invoices. <br /> TOTAL PRE-APPROVED $ 23,170 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Foothill Engineering proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal by Foothill Engineering for conducting the work approved by the <br /> County for implementing the September 28, 1998, Foothill Engineering workplan. <br /> I also want to remind you that the Fund' s regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified fines for all necessary corrective action work. <br /> The legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> consultant services for corrective action. If you need assistance in contracting for corrective <br /> action services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. To make this easier, insure that your consultant <br /> California Environmental Protection Agency <br /> ca Recycled Paper <br />