My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1201
>
3500 - Local Oversight Program
>
PR0544188
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 1:02:50 PM
Creation date
2/27/2019 9:38:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544188
PE
3526
FACILITY_ID
FA0006698
FACILITY_NAME
FERNANDOS PLACE
STREET_NUMBER
1201
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14716003
CURRENT_STATUS
02
SITE_LOCATION
1201 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I OW <br /> Messrs Trommer and La. :on 16 June 2008 <br /> Preliminary Five-Year Review Letters Page 7 of 7 <br /> Various Sites <br /> 11530 Eight Mile Road , W. <br /> • The CUF recommended directing assessment and implementation of active <br /> remediation ; the EHD agrees with the intent of the recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delineation investigation and a pending SCM has been <br /> received and reviewed by the EHD . <br /> 14749 Thornton Road , N . <br /> • The CUF recommended evaluation of the sampling frequency and <br /> implementation of SVE/IAS. The EHD agrees with the recommendation; a RAP <br /> has been approved , the needed wells have been installed and the remediation <br /> system is under construction . <br /> 15615 7 h Street, S. <br /> • The CUF recommended implementation of active remediation without delay; the <br /> EHD agrees with this recommendation . A favorable pumping test has been <br /> completed and reported , DPE has been approved for the site, the system has <br /> been installed and permits to operate are pending from the City and SJVUAPCD. <br /> 23569 Santa Fe Road , S. <br /> • The CUF recommended termination of SVE and monitoring groundwater for one <br /> hydrological cycle. The EHD agrees with the recommendation; a work plan to <br /> install fourteen MIP borings on and off site has been approved . <br /> 800 Main Street, E. <br /> • The CUF agreed with the EHD on the approved remedial work plan . <br /> Questions or comments should be directed to the appropriate caseworker. <br /> Sincerely, 4, <br /> Harlin Knoll , REHS �,y� Michael In rna, REHS <br /> Senior Registered Environmental (J Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> Nuel Henderson , PG Margaret L4gbrio, REHS <br /> Engineering Geologist Program Coordinator <br /> 5-Year Review Comment Letter 061608.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.