Laserfiche WebLink
FERNANDO'S PLACE Page 1 of 2 <br /> Path to Closure Plany, Gd GEOTRACKERHOME I MANAGE PROJECT51Bf.QQSL@ILT <br /> --_ OPEN-REMEDIATION <br /> FERNANDO'S PLACE(70607700692)-MAP THIS SITE <br /> 1201 CENTER$T$ ANUP OVERSIGHT AGENCIES <br /> ACTIVITIES REPORT SAN JOAOUIN COUNTY LOP(LE4D)-C4SE#505309 <br /> STOCKTON,CA 95209 CASEWORKER ANGFI r__SANDOVAL MARIN-SUPERVISOR:ADRIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CENTRALVALLEY RNAICB(REGION 55)-CASEa390665 <br /> CASEWORKER JAMESBARTON-SUPERMSOR COR'CONDON <br /> MEW PRINTABLE CSE SUMMARY FOR THIS SUE <br /> CUF Claim#.12166 CUF PriorityAssignetB CUF Amount Paid 398)2]1 <br /> THIS PROJECT WAS LAST MODI FIED BY NDRON ON 17/420131139:59 AM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CLICK HM TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan-FY 12/13 THIS VERSION IS RNAL AS OF 12/42013 PATH TO CLOSURE HISTORY CO.EAR I RESETPTH TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> General Criteria E:A conceptual site model that assesses the nature,extent and mobility of the release ❑ Procedural Impediment-uvroo <br /> has NOT been developed <br /> Step to Resolve ImpatllmeM 1-Step 1:- COMPLETION DAIS <br /> The full vertical and lateral extent of this very large plume of iapacted groundwater is no known at PROJECTED DATE AgIVALDATE <br /> this time, but an adequate CSN exists to focus scarce funds on remediation of the plume core. Obviously 1142016 F <br /> a thick and intesely impacted plume, reliable vertical delineate say need to be completed after _. <br /> a„f£iciaa t_ee iafimavnf.Mal.ln�and3nte+satllaLvire,fh nne�innn_DD ADDITIONAL <br /> 2 minimiar_eeuvv- ___ <br /> ADO ADOmONgL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable r Procedural Impediment-)JLpo,E <br /> Stepto Resolvelm dImer12-Stsp1:-DE FMS ° COMPLETION DATE <br /> Implement approved ISCO pilot study and submit report of findings and [ecomm,entlatione. <br /> P0.0JECTED DATE ACNAL GATE <br /> 9I30.rX)14 ' �� <br /> Ste to Resolve Impediment 2-Step2:-Dm ETESTBP COMPLETION DATE <br /> Prepare and submit a corrective Action Plan PROJECTED DATE ACTUAL DATE <br /> _ 12/310014 �- <br /> Step to Resolve Impediment 2-Step 3:-DELETE STEP COMPLETION DATE <br /> r77777proval of the CAP eenJECTE00e_TE —pCT11AL GATE <br /> 3.312015 �- <br /> Step to Resolve Impediment 2 Sle d:-DF cm STEP COMPLETION DATE <br /> Implement Final Remediation Plan pROJECTE00AlE ACTUAL DALE <br /> 990"X115 <br /> Step to Resolve Impediment 2-Step 5:-DELETE STEP COMPLETION DAIS <br /> 17to site remetliation. p OJEC DATE ACTUAL DATE <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> MetllaSoeC Ic Criteria:Groundwater:The contaminant plume that exceeds water quality objectives is fl Procedurallmpediment-I� <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics ofone of <br /> the five classes of sites. <br /> Condition that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):2 250 Feet and<1,000 Feet <br /> • Plume is Stable or Decreasing in AREAL Extent:Unknown <br /> • Benzene Concentration:2 3,000 pg/l <br /> • Nearest Supply Well(From Plume Boundary):5 250 Fast --1 <br /> 1mptoentRasa"lmpetlimaM 3-Step Itu 'TES P COMPIETON DATE <br /> Implement approved ISCO pilot study and submit report of findings and recommendations. PROJECTED DATE 1 ATE <br /> 91302014_ J �J <br /> Step to Resolve Impediment 3-Soup 2:-DELETE STEP COMPLETION DATE <br /> r7sut.it a Coaective Action Plan PROJECTED DATE ACNAL DATE <br /> _. 12/312014/ / <br /> Ste to Rasolvelmpediment3-Step3:-D ETES P COMPL ICIMM ATE <br /> Contluc[ public paztrdpatlon event for approval of the CAP PROJECTED DATE TUALDATE <br /> &312015 �7 <br /> Step to Resolve Impediment 3-Step 4:-D IETES P COMPLETION DATE <br /> r�/crrarne/rincire. nn1icv-asn?0oba1 id=TO... 12/4/2013 <br />