My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 12:50:41 PM
Creation date
2/27/2019 10:42:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ix <br /> GENERAL PROVISIONS In . <br /> 1. VALIDATION/REVOCATION-This permit is not valid unless signed by the Public Works Director or his authorized representative. This petransferable and is void if work is not completed prior to expiration date. An extension may be granted if such is requested forty-eight(48)hpermit expires: <br /> 2. ACCEPTANCE OF PROVISIONS-It is understood and agreed by the permittee that the performing of any work under the permit,shall conacceptance of the provisions. <br /> 3. KEEP PERMIT AT JOBSITE-The permit and control number shall be kept on the jobsite and shall be shown to any representative of the City requesting <br /> verification of permit issuance. <br /> i <br /> 4. INSPECTION AND APPROVAL-Aminimum of 24 hours.notice shall be required prior to placing any backfill,connection to any existing facility,or the <br /> placement of any concrete or asphalt paving. Inspection;shall not be deemed a waiver on the part of the City of the right to demand correction of defects <br /> discovered at a subsequent date. - - <br /> S. STANDARD PLANS AND SPECIFICATIONS-All work shall conform to the City of Stockton Standard Plans and Specifications. I� <br /> 6. SURVEY MONUMENT PRESERVATION-Any monuments including,but not limited to,chisel crosses,witness corners,and iron pins that control the <br /> location of subdivisions,tracts,boundaries,property lines,roads,streets;or provide survey controls,and that may be disturbed or destroyed during <br /> "construction,shall be referenced by a licensed land surveyor and reset in the surface of the new construction or seta permanent witness monument. <br /> Corner records or Records of Survey shall be filed as required. (California Business and Professions Code 8771 and California.Streets and Highways <br /> Code 732.5, 1492.5, 1810.5) <br /> 7. MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC-All work shall be planned and carried out so there will be the least possible " <br /> inconvenience to the traveling public. Placing of lights,barricades,warning signs and other safety devices required for public safety shall be the <br /> responsibility of the permittee. All work-zone traffic controls shall be in accordance with the most current revision of Chapter 5 of the State of California; <br /> Department of Transportation Traffic Manual <br /> 8. STANDARD WORKING HOURS-All work shall be restricted to the hours between 8:30"a.m._and 4:30 p.m.,except on arterials and collectors where the <br /> work is limited to the hours between 9:00 a.m.and 3:00 p.m.,unless otherwise noted on this permit. <br /> 9. FAILURE TO COMPLY WITH GENERAL PROVISIONS-The permittee agrees to reimburse the City for performing all work and furbishing all materials to <br /> correct any failure to comply with these provisions,as well as all applicable City Ordinances and Standard Plans and Specifications currently in effect. <br /> 10. NOTIFICATION OF UTILITY COMPANY-The permittee shall notify utility companies 48 hours prior to beginning any construction,which may involve <br /> underground or overhead facilities and will pay all expenses for any removal or relocation necessary.Valves on water mains may not be turned off without <br /> permission of the utility company involved. <br /> 11. NOTIFICATION OF POLICE,FIRE AND PUBLIC WORKS DEPARTMENTS-When streets are to be blocked.the Police,Fire and Public Works <br /> Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered.Access to fire hydrants shall be maintained <br /> at all times. Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer. <br /> 12. CLEANUP OF JOBSITE-The permittee will remove any refuse material from the jobsite within three days after completion of the work. <br /> 13. DELINQUENT BILLS-Failure to pay any delinquent bill accrued under any previous permit issued by the Public Works Department will be cause for <br /> rendering the applicant ineligible for any other permit from the Public Works Department until such bill is paid. <br /> I <br /> 14. MEETING EXISTING IMPROVEMENT The'permltteesnall be respohsible for meeting all adjacent frontage-improvements such as paving and sidewalks. <br /> 15. PARKING METER AND TRAFFIC SIGN REMOVAL The permittee shall contact either the Traffic Maintenance Supervisor at(209)937-7408,or the <br /> Senior Public Works Supervisor at-(209) 937=8531 of,the,Pubtic Works.Traffic Devices Section,at least 48 hours prior to any parking meter or traffic sign <br /> "removal. t <br /> *'IMPORTANT* <br /> MANDATORY.Encroachment Permit Procedures <br /> To provide a more efficient and economical inspection service for Encroachment Permit construction,the following procedure shall be followed by all permittees: <br /> 1. Notify the Permit Engineer, (209)937-8366,to obtain,a control number,no less than 24 hours,but not in excess of 72hours prior to the start of work; . <br /> and prior to any required inspections as identified below. If work does not begin within 72 hours of the issuance of a control number;the control `. .. j <br /> number will be invalid and the permittee shall call for a new control number. (For City Capital Improvement Projects or subdivision improvements, <br /> permittee shall contact the assigned City Project Engineer at(209)937-8411 for specific instructions prior to the beginningof any work.) <br /> 2. -Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction. <br /> j 3. Advise Permit Engineer of name and phone number of contact person for the.project prior to beginning work. - _ <br /> 4. Notify Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection <br /> 5. Notify the Permit Engineer upon completion of construction at(209) 937 8381. 3 <br /> r n <br /> REQUIRED INSPECTIONS <br /> Listed below are several types of construction and points at which inspections must be made prior to'contimmng construction operation Unauthorized <br /> continuance of construction beyond an inspection point may result in rejection of all work <br /> CONCRETE PIPE INSTA"TION:- r ij <br /> 1. Grade and excavate before forming 1. Excavating and bedding a xr <br /> 2. Forming before placement of concrete 2. Pipe installation and/or utility connections <br /> 3. Beginning and duringasphaltpaving 3. Backfill(compaction test may be required) <br /> I 4. Cleanup and final.approval - 4. "Beginning and during asphalt paving " <br /> 5. Final approval <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.