Laserfiche WebLink
for full-scale implementation SJCEHD approved the workplan in <br /> correspondence dated August 6, 2002 <br />' The air sparging and soil venting pilot test was performed in January 2003 <br /> The pilot test results were submitted in the March 6, 2003 Remedial Action <br />' Plan The findings indicate that this approach would be effective in <br /> remediating impacted soil and groundwater SJCEHD approved the Remedial <br /> Action Plan in correspondence dated March 25, 2003 <br /> Under an approved San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD) permit, PSC installed a soil vapor extraction (SVE) system and <br /> began continuous operation on November 18, 2003 <br /> During system operation, airflow rates are measured in sparging well SP-1 <br /> and in venting wells VW-1 and MW-2 weekly The combined venting rates <br /> prior to the addition of dilution air for VW-1 and MW-2 have ranged from <br /> 21 48 cubic feet per minute (cfin) to 90 05 cfm, as of December 16, 2004 In <br /> addition, three vapor samples are collected from the influent stream prior to <br /> the addition of dilution air (designated Influent), the air stream after treatment <br /> by the first carbon vessel (designated GAC-1), and from the discharge from <br /> ' the second and final carbon vessel (designated GAC-2) The samples are then <br /> submitted to an analytical laboratory for BTEX and TPH-G analyses Results <br /> are reported to the SJVAPCD <br /> A quarterly groundwater-monitoring event was performed in January 2004 <br /> The event data indicated that the groundwater elevation was approximately <br /> 1 7 feet lower than the previous event performed in April 2003 During this <br /> event, the average depth to groundwater was 29 16 feet below ground surface <br /> (bgs) {49 39 feet mean sea level (msl)l All referred bgs measurements are <br /> ' taken from the top of well casing The groundwater flow was easterly at a <br /> gradient of approximately 0 005 foot per linear foot Petroleum hydrocarbons <br /> were detected in well MW-2, but concentrations were significantly lower than <br /> in previous events There were no detectable BTEX or TPH-G concentrations <br /> measured in the samples collected from the remaining wells MW-1, MW-3, or <br /> MW-4 Oxygenate analytes were not detected in any samples <br />' The April 2004 quarterly groundwater-monitoring event indicated that the <br /> groundwater elevation increased approximately 142 feet from the previous <br />' event performed in January 2004 During this event, the average depth to <br /> groundwater was 27 73 feet bgs (47 97 feet msl) The groundwater flow was <br /> easterly at a gradient of approximately 0 005 foot per linear foot Benzene <br />' was not detected in well MW-2 during this event The concentrations of <br /> toluene, ethylbenzene, xylenes, and TPH-G in well MW-2 decreased <br /> significantly from previous events BTEX and TPH-G were not detected in <br /> the samples collected from wells MW-1, MW-3, or MW-4 MTBE was the <br /> Quarterly Groundwater Monttoring Report <br /> May 2005 <br /> Prepared for SARA LEE BAKERY GROUP,INC Prepared by Philip Services Corporation <br /> Investigative and Quarts ly Report 52nd Quaneriy Report 05_2005(final) September 23,2005 <br />