My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001434
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
1034
>
3500 - Local Oversight Program
>
PR0544196
>
ARCHIVED REPORTS XR0001434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 3:57:53 PM
Creation date
2/27/2019 1:55:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001434
RECORD_ID
PR0544196
PE
3528
FACILITY_ID
FA0006536
FACILITY_NAME
WELLS FARGO BANK PROPERTY
STREET_NUMBER
1034
STREET_NAME
CENTRAL
STREET_TYPE
AVE
City
TRACY
Zip
94805
APN
23517127
CURRENT_STATUS
02
SITE_LOCATION
1034 CENTRAL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> GR Field Methods and Procedures <br /> Construction of Monitoring Wells <br /> Monitoring wells are constructed in the exploratory soil borings with Schedule 40 polyvinyl chloride (PVC) <br /> casing All joints are thread joined,no glues,cements,or solvents are used in well construction The screened <br /> interval is constructed of machine-slotted PVC well screen which generally extends from the total well depth to <br /> a point above the groundwater An appropriately-sized sorted sand is placed in the annular space adjacent to the <br /> entire screened interval A bentonite transition seal is placed in the annular space above the sand, and the <br /> remaining annular space is sealed with neat cement or cement grout <br /> Wellheads are protected with water-resistant traffic-rated vault boxes placed flush with the ground surface The <br /> top of the well casing is sealed with a locking waterproof cap A lock is placed on the well cap to prevent <br /> vandalism and unintentional introduction of materials into the well <br /> Measurement of Water Levels _ <br /> The top of the newly-Installed well casing is surveyed by a Califomma-licensed Land Surveyor to mean sea level <br /> (MSL) Depth-to-groundwater in the well is measured from the top of the well casing with an electronic water- <br /> level indicator Depth-to-groundwater is measured to the nearest 0 01-foot,and referenced to MSL <br />• Well Development and Sam lin <br /> The purpose of well development is to improve hydraulic communication between the well and the surrounding <br /> aquifer Prior to development,each well is monitored for the presence of floating product and the depth-to-water <br /> is recorded Wells are then developed by alternately surging the well with a vented surge block,then purging the <br /> well with a pump or bailer to remove accumulated sediments and draw groundwater into the well Development <br /> continues until the groundwater parameters(temperature, pH, and conductivity)have stabilized <br /> Storing and Sampling of Drill Cuttings <br /> Drill cuttings are stockpiled on and covered with plastic sheeting and samples are collected and analyzed for <br /> disposal classification on the basis of one composite sample per 100 cubic yards of soil Stockpile samples are <br /> composed of four discrete soil samples, each collected from an arbitrary location on the stockpile The four <br /> discrete samples are then composited in the laboratory prior to analysis <br /> Each discrete stockpile sample is collected by removing the upper 3 to b inches of soil, and them driving the <br /> stainless steel or brass sample tube into the stockpiled material with a hand,mallet,or dnve sampler The sample <br /> tubes are then covered on both ends with teflon sheeting or aluminum foil,capped, labeled,and placed in a cooler <br /> with blue ice for preservation A chain-of-custody form is initiated in the field and accompanies the selected soil <br /> samples to the analytical laboratory Stockpiled soils are covered with plastic sheeting after completion of <br /> sampling <br />
The URL can be used to link to this page
Your browser does not support the video tag.