Laserfiche WebLink
San Joaquin County 12066.000.000 <br /> PCCP Mountain House Property May 7, 2015 <br /> ENVIRONMENTAL ASSESSMENT WORKPLAN Page 4 <br /> • De-ionized/distilled water rinse. <br /> INVESTIGATION-DERIVED WASTE <br /> Investigation-derived waste, including soil cuttings and rinsate from equipment decontamination, <br /> will be placed into 55-gallon drums, or equivalent. The drums will be clearly labeled as <br /> containing "Investigation-derived Waste". Lids and bungholes will be securely closed. The <br /> drums will be stored on the Property premises prior to removal by a licensed transporter for <br /> appropriate disposal. Prior to transport, samples will be collected from the drums and analyzed at <br /> the laboratory listed above for waste characterization purposes. The specific analytes for waste <br /> characterization and the transporter will be determined at a later date. <br /> SCHEDULE <br /> We will schedule the field exploration as soon we receive approval of this work plan. We expect <br /> that we will complete the field exploration in one day. Depending on driller avalability, and <br /> pending approval of this work plan, we tentatively propose to perform the field exploration on <br /> May 22, 2015. <br /> If you have any questions on any portion of the work plan, please call and we will be glad to <br /> discuss them with you. <br /> Sincerely, <br /> ENGEO Incorporated <br /> K cju� <br /> Kelsey hart,FIT n Munger, CHG <br /> Divya Bhargava, PE <br /> Attachments: Figure 1 <br /> Well &Boring Permit Application <br /> Master File Record Information Form <br /> Health & Safety Plan <br />