My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
730
>
3500 - Local Oversight Program
>
PR0544199
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 8:33:11 PM
Creation date
2/27/2019 4:14:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544199
PE
3528
FACILITY_ID
FA0014183
FACILITY_NAME
RAYMOND INVESTMENT CORPORATION
STREET_NUMBER
730
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
730 E CHANNEL ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vicki McCartney [EH] <br /> From: Bill Cook [bcook@condorearth.com] <br /> Sent: Monday, August 03, 2009 8:34 AM <br /> To: Vicki McCartney [EH] <br /> Subject: Channel Street Work Plan <br /> Condor respectfully requests an extension of the due date for the work plan to delineate the groundwater plume <br /> and feasibility study to address contamination in the vadose zone, as described in your letter dated May 12, 2009. <br /> Condor requests that the due date for the investigation work plan be extended to August 18, 2009. Condor also <br /> requests that the due date for the feasibility study be extended to December 15, 2009. <br /> The investigation work plan is in peer review now, and will be competed very soon. I revised my original draft to <br /> include vapor wells and one extra cross-section to show that data gaps were being effectively addressed. The <br /> longer extension for the feasibility study will allow me to integrate the data from the well installation. Verification of <br /> vertical extent of groundwater impact is important to estimating the cost/effectiveness of various remedial <br /> methods. <br /> This message is intended for the use of the individual or entity to which it is addressed,and may contain information that is privileged,confidential <br /> and exempt from disclosure under applicable law.Any unauthorized use,distribution,or disclosure is strictiy prohibited. If you have received this <br /> message in error,please notify sender immediately and destroy/delete the original transmission. <br /> 8/3/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.