Laserfiche WebLink
it <br /> 12) Prepare a report summarizing the results of the above investigation. <br /> 5.2 UST Abandonment <br /> The following procedures will be performed for in place abandonment of the UST(the tank <br /> is currently empty and not in use): <br /> 1) The UST and piping will be triple rinsed by a certified contractor. The rinsate will <br /> be containerized in 55-gallon DOT drums. <br /> i <br /> 2) The rinsate will be transported under manifest to an appropriate disposal facility. <br /> 3 PP �Upon approval of the PHS/EHD personnel of PCM will fill the UST with a concrete <br /> P <br /> slurry. <br /> The opportunity to prepare this work plan is greatly appreciated. Please contact our office <br /> if you have any questions. I <br /> Sincerely, I. <br /> GEOLOGICAL AUDIT SERVICES, INC. ' <br /> I <br /> 1 <br /> I <br /> j <br /> Bob Marty { <br /> Project Manager <br /> i <br /> 1 <br /> Gw1oS l Audit Servicm 1— 1 <br /> PmdCh—.WPK 94/SG9405.9U-M <br /> till <br /> q: <br />