Laserfiche WebLink
Received on 10/23/2019 <br /> SJC EHD - CR <br /> 2.0 Secondary Containnient <br /> Observation. Corranents/Recorronandations <br /> econdary Containment T pe oncrete Barrier <br /> econdary Containment Length 3" <br /> econdary Containment Vddth 2161, <br /> ecoridary Containment Height 361, <br /> ecoridary Containment Volume allons 5,585 Gallons <br /> econdary Containment Condition ood <br /> breaches,foreign material,liquid) <br /> econdary Containment Drain Valve o <br /> nstalled? <br /> Pram Valve Locked? A <br /> um Pum Installed? A <br /> s The Sump Pump Float Automatically or A <br /> anua0 Acilvatad? <br /> then <br /> ,3.0 Secondary Containnnent(AS7) <br /> econdary Containment(AST)-DNd,Double <br /> Bottom or Secondary Containment(Pans, A <br /> Boxes or Containers <br /> ST Containment Condition?Dry? /A <br /> rain Valve Installed 10 <br /> rain Valve Locked? TA <br /> mer <br /> 4.0 Tank AApurtename. <br /> n cary Equipment:Piping/Piping ood <br /> onnections leaks,corrosion, su orts <br /> the <br /> Anil Siphon Valve installed? A <br /> Anti Siphon Valve Manufacturer A <br /> Anti Si hon Valve Model A <br /> Is the Anil Siphon Valve Operational And A <br /> Properly Sized? <br /> Fire Valve Installed? WA <br /> Fire Valve Manufacturer TA <br /> Fire Valve Model Number TA <br /> Is the Fire Valve Operational? TA <br /> he, <br /> ormal Vent Manufacturer PW <br /> armal Vent Size <br /> amral Vint Model 3 series <br /> ormal Vent Condition ood <br /> amral Vent Property Sized? as <br /> 4 <br />