Laserfiche WebLink
Cesar Ruvalcaba [EH] <br /> From: Costanza, Mike (Penske) <mike.costanza@penske.com> <br /> Sent: Tuesday, January 15, 2019 11:46 AM <br /> To: Cesar Ruvalcaba [EH] <br /> Cc: Gomes, Philip (Penske); Brown, Chavela K (Penske); Nascimento, Henry M (Penske); <br /> Yazemboski, Brian S (Penske) <br /> Subject: RE: Penske Inspection - 3663 Peterson Rd., Stockton <br /> Cesar, <br /> As mentioned below in my email below from 12/21/19, the work to remove the manifold between the diesel tanks <br /> required additional time but has been completed as of 1/9/19. <br /> Please let me know if you need any additional information. <br /> From: Costanza, Mike (Penske) <br /> Sent: Friday, December 21, 2018 10:43 AM <br /> To: 'cruvalcaba@sjcehd.com' <cruvalcaba@sjcehd.com> <br /> Cc: Gomes, Philip (Penske)<Philip.Gomes@penske.com>; Brown, Chavela K (Penske) <chavela.brown@penske.com>; <br /> Nascimento, Henry M (Penske) <henry.nascimento@penske.com>;Yazemboski, Brian S (Penske) <br /> <brian.yazemboski@penske.com> <br /> Subject: Penske Inspection -3663 Peterson Rd., Stockton <br /> Cesar, <br /> In response to your inspection of the above-referenced site on 11/27/18, below are responses to the issues <br /> noted on the inspection report: <br /> ? Item #301—Our plan is to remove the permanent manifold between the two ASTs; our contractor <br /> (Tank Specialists of CA) is assessing the tank system to determine the best configuration to ensure we <br /> can continue to receive fuel drops and dispense fuel without interruption. We will likely not have this <br /> completed by 12/27/18 and are requesting an extension so the work can be completed. <br /> ? Item #604—The SPCC Plan has been updated to include the additional 55-gallon drums along with an <br /> estimate of the potential number of drums that could be expected to be on site (revised SPCC Plan is <br /> attached) <br /> ? Item #609—The SPCC Plan has been revised to include the CUPA contact information (revised SPCC <br /> Plan is attached) <br /> ? Item #710—The SPCC Plan has been revised to include the information concerning annual inspections <br /> of the ASTs (revised SPCC Plan is attached) <br /> ? Item #718 - Secondary containment pallets have been provided for the referenced drums (see <br /> attached photo) <br /> If you have any questions or need additional information, please do not hesitate to contact me at the number <br /> below. <br /> Thanks, <br />