Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> Thlssectlon roust 6e wrrpkfetl lfa monitlnirrg panel is usetl tlr perhxm leak tleteMion rrroruh nrgr. Y N NA <br /> Are the visual and autlbe alarms operational? 10 ❑ ❑ <br /> Were all sensors visually inspectetl for kinks and breaks in the cables and for residual buildup to ensure that ficats moos:freely, ❑' ❑ ❑ <br /> functionally tested, and wnirmed operational? <br /> Were all sensors installed ai fo ed pant of secondary containment and positioned so that cther equipment AN not interfere with Iheir ❑' ❑ ❑ <br /> proper operation? <br /> Was monitoring system sel-up revieweri to ensure proper settings? Q ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally fastest,and confirmed operational? ❑' ❑ ❑ <br /> Does the fiowof fuel slop at the dispenser if a eak is call in the under-dispenser containment? 0 ❑ ❑ <br /> Does the turbine mimetically shut down if the piping secondary containment monitoring system page to operate or is electrically O ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system deteds a leak? ❑ ❑ ❑ <br /> Mich sensors intiiate positive shut down? (Check allthat apply.) E)Sump El Under-dispenser containment <br /> fi alarms are relayetl to a remote monitoring station,is all communications equipment(e.g.modern)operational? ❑ ❑ <br /> Foran ansae a-Wab ,clescrlbeln.11c i IXhowantlwhenthesecefMlenclea.e wHibecomec .. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> Check me box R lank gauging is used only for inventory,control.(Do not complete this section.) <br /> ❑ Check the box R NO lank gauging equipment is installed.(Do not compete tNs section) Y N NA <br /> This sectknr rrrust be comilakied If In-lank pauglim Is used to penflam leak detection monkorf . <br /> Has al input wiring been inspected for kinks and breaks n the cables an for proper entry and termination,including testing for ground ❑' ❑ ❑ <br /> faults? <br /> Were al in-tank g auging p rob as visually inspectetl for damage and residue buildup to ensure that ficats m ove freely,functionally tastiest, O ❑ ❑ <br /> and confirmed! enational? <br /> Was accuracy W system's product level readings fastest? ❑ ❑ <br /> Was accuracy M system's water level readings tastiest? Q ❑ ❑ <br /> Were al probes reinstalled properly? ❑ ❑ <br /> Were al items on the equipment manufacturers maintenance checklist completed? Q ❑ ❑ <br /> Is&any answera-W above descifbe In secflon Xl how and when these tleflNencles wens or will be correc .. <br /> XI. COMMENTS <br /> Probes were tested <br /> Y=Yes,N=No,NA=Not Applicable <br />